With the project included in the government plan: "Reconnect communities divided by the railway"

Nowon-gu, Seoul (District Chief Seo Junho) has unveiled a plan to link the undergrounding of the Gyeongwon Line, included in the government's comprehensive railway undergrounding plan, with development around Kwangwoon University Station and the Changdong train depot. The aim is to reconnect communities divided by the railway and use the aboveground railway land for parks and mixed-use development around stations.

Guide map for the Gyeongwon Line railway undergrounding project. Courtesy of Nowon-gu.

Guide map for the Gyeongwon Line railway undergrounding project. Courtesy of Nowon-gu.

View original image

The plan, unveiled by the Ministry of Land, Infrastructure and Transport at a public hearing on November 19, includes the 32.9-kilometer section of the Gyeongwon Line from Seobinggo Station to Dobongsan Station as a newly proposed project. The section in Nowon-gu runs through Seokgye Station, Kwangwoon University Station, Wolgye Station and Nokcheon Station, reaching the area near Changdong Station.


The district expects undergrounding the line to make it easier for people to travel between areas that have long been separated by the railway. It also anticipates a significant reduction in disruptions to residents caused by train noise, vibration and dust. The aboveground land would be used for parks, green spaces and pedestrian paths. Mixed-use development combining business, commercial and residential functions could be pursued around the stations.


The district plans to link the project with development around Kwangwoon University Station and the Changdong train depot, as well as the district-unit plan for the area around Seokgye Station, to create jobs and revitalize local businesses.


District Chief Seo Junho said, "I am very pleased that the long-awaited undergrounding of the Gyeongwon Line has been included in the comprehensive plan, and I thank the government for supporting the project." He added, "We will work to improve residents' quality of life and invigorate the local economy by reconnecting communities divided by the railway and turning the aboveground railway land into a green Rail Park and a space for mixed-use development around the stations."


In November 2024, Nowon-gu formed the Gyeongwon Line Undergrounding Promotion Council with Yongsan, Seongdong, Dongdaemun, Jungnang, Seongbuk and Dobong districts and has since called for the line to be put underground. However, there is still a long way to go before construction can begin. Further review is needed of how to carry out construction while trains continue to run, potential conflicts with connecting lines such as GTX-B and GTX-C, and plans for relocating and operating the train depot. Once the plan is finalized and officially announced, it must undergo a preliminary feasibility review, the development of a basic plan and a preliminary feasibility study.



Another factor is that the project, estimated to cost approximately 10.6 trillion won, would be funded through profits from development above the railway rather than national government funding. The district plans to work with the Ministry of Land, Infrastructure and Transport, the Seoul Metropolitan Government and the local governments participating in the council on the next steps, while focusing on minimizing disruptions to residents during construction.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing