Ansan Mayor Lee Mingeun meets with vice minister to call for five key regional transport projects
"Extend the Shin Ansan Line to Daebudo and the Shinbundang Line to Banwol Station for easier trips to Gangnam"

Lee Min-geun, mayor of Ansan, Gyeonggi Province, met with Second Vice Minister of Land, Infrastructure and Transport Jeong Ui-gyeong on Nov. 23 and asked that the extension of the Shin Ansan Line to Daebudo and the extension of the Shinbundang Line to Banwol Station be included in the Fifth National Railway Network Construction Plan.

Ansan Mayor Lee Min-geun (right) shakes hands with Second Vice Minister of Land, Infrastructure and Transport Jeong Ui-gyeong after handing him a policy proposal requesting that the Shinansan Line and Shinbundang Line extension projects be included in the National Rail Network Construction Plan. Provided by Ansan City.

Ansan Mayor Lee Min-geun (right) shakes hands with Second Vice Minister of Land, Infrastructure and Transport Jeong Ui-gyeong after handing him a policy proposal requesting that the Shinansan Line and Shinbundang Line extension projects be included in the National Rail Network Construction Plan. Provided by Ansan City.

View original image

Lee delivered a proposal outlining five key transport issues, including the railway extensions: improving capital-area commuter rail services; coordinating the undergrounding of the Ansan Line and Jungang-daero; and building a new expressway interchange (IC) for Jangsang District.


The proposed Shin Ansan Line extension to Daebudo would connect a provisionally named Hanyang University Station to Daebudo via Sadong and Songsan Green City in Hwaseong, covering approximately 28 kilometers and adding seven stations.


Ansan City says expanding the railway network is essential to prepare for attracting businesses to the Ansan Science Valley (ASV) Special Economic Zone, the mixed-use development of Blocks 89 and 90 in Sadong, and development of the former Korea Institute of Ocean Science and Technology site. The plan is also intended to improve access to downtown for Daebudo residents and increase the number of tourists. In August, a petition signed by about 25,000 residents urging the project to move forward was delivered to the Ministry of Land, Infrastructure and Transport.


The proposed Shinbundang Line extension to Banwol Station would connect Gwanggyo Station in Suwon to Banwol Station in Ansan via Suwon, Uiwang and Gunpo, spanning approximately 14.54 kilometers. If passengers can transfer to Subway Line 4 at Banwol Station, commutes from eastern Ansan to Pangyo and Seoul's Gangnam area would be significantly faster. The extension could also accommodate transport demand from the planned public housing districts in Uiwang, Gunpo and Ansan. In August, Ansan joined Suwon, Uiwang and Gunpo in jointly requesting that the line be included in the national railway network plan.


Lee also called for measures to ease bottlenecks on existing rail lines. He asked the ministry to minimize reductions in the number of Line 4 services when the KTX high-speed rail service from Incheon begins operating, and to build a shared turnback track so that Suin-Bundang Line trains bound for Gosaek can continue to Handaeap Station.


He also requested administrative support for the Ansan Line and Jungang-daero undergrounding project, which would reconnect the downtown area divided by railways and roads, as well as prompt approval of a Hi-Pass interchange providing direct access from Seoseoul Tollgate to Jangsang District.



Ansan Mayor Lee Min-geun said, "It is important to expand the regional rail network so that residents and businesses can use it conveniently before industrial and residential development in Sadong gains momentum. We will do our utmost to have both projects included in the national railway network plan so that the Shin Ansan Line extension can improve transport conditions in Sadong and Daebudo, and the Shinbundang Line extension can improve access from eastern Ansan to Pangyo and Gangnam."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing