Secured 688 votes at the Nov. 21 meeting

Building a large complex with 2,350 homes

DL E&C has been selected as the contractor for the redevelopment project in District 2 of the Seongsu Strategic Maintenance Zone (Seongsu District 2) in Seongsu-dong, Seongdong-gu, Seoul, with construction costs of 2 trillion won.


DL E&C announced on November 23 that it had been selected as the contractor at a general meeting held on November 21 at Seongrak Sungkyul Church in Seongdong-gu, Seoul. It received 688 of 757 votes, or 90.9% of the total.

Perspective rendering of the landscaping at the ACRO Seongsu complex. Provided by DL E&C.

Perspective rendering of the landscaping at the ACRO Seongsu complex. Provided by DL E&C.

View original image

The Seongsu District 2 redevelopment project will build an apartment complex along the Han River in Seongsu-dong, Seongdong-gu, Seoul. The complex will have nine buildings, with up to 62 floors above ground and six basement levels, and a total of 2,350 households. The total construction cost is 2.0137 trillion won. DL E&C proposed “Acro Seongsu” as the complex’s name.


DL E&C designed the exterior and skyline to take advantage of views of the Han River in collaboration with global architecture and engineering group Arcadis. Its design proposal provides Han River views from homes equivalent to 110% of the number of homes allocated to members of the housing association. It will work with British engineering firm ARUP on the high-rise structural design.


The complex will feature specialized layouts for super penthouses, panoramic houses and terrace houses. The plans include higher ceilings to create a greater sense of openness and expansive views, as well as open terraces in a quantity exceeding the number of homes allocated to association members.


Community facilities will be developed in collaboration with global interior design studio Yabu Pushelberg. They will include all-day dining, an indoor infinity pool and studios exclusively for association members, as well as a sky community offering views of the Han River.


A DL E&C representative said, “We will bring together our global design capabilities and Acro’s residential philosophy to complete an iconic landmark that will drive Seongsu’s future value. We aim to become the one and only ‘keystone’ that completes Seongsu’s future.”



DL E&C was selected in June as the contractor for the redevelopment of Mokdong Complex 6 in Yangcheon-gu, with construction costs of 1.2868 trillion won, and has now won the Seongsu District 2 redevelopment project. The company plans to pursue contracts for major redevelopment projects in Seoul, including in Yeouido.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing