As CSAT English Listening Began, Planes Circled Overhead... A 35-Minute Spectacle for Test Takers [On the Scene]
35-Minute Flight Restrictions During CSAT English Listening Test
Aircraft Circle at Altitudes of 3 Km or Higher
Departure Lounge Crowded; Aircraft Wait on Runway for Takeoff
Schedules Adjusted for 130 Flights Nationwide... Drones Also Grounded
For 35 minutes from 1:05 p.m. on the afternoon of Nov. 19, when the English listening section of the 2027 College Scholastic Ability Test (CSAT) was held, takeoffs and landings were suspended at airports nationwide. Jeju International Airport's departure lounge was crowded with waiting passengers, while aircraft with passengers already on board waited on the runway and in the air for operations to resume.
As takeoffs and landings at Jeju International Airport were suspended during the English listening section of the College Scholastic Ability Test on the afternoon of the 19th, aircraft awaiting landing circled in the airspace over the waters east of Jeju. Image source: Flightradar24]
View original imageAccording to the Ministry of Land, Infrastructure and Transport, to prevent aircraft noise during the English listening section (1:10-1:35 p.m.), takeoffs by all aircraft at every airport nationwide were prohibited for 35 minutes, from 1:05 p.m. to 1:40 p.m., including the five minutes before and after the test. Emergency and urgent flights were exempt.
As a result of the restrictions, the departure and arrival times of 130 flights in total were adjusted in advance: 81 international flights and 49 domestic flights.
The boarding-gate waiting area at Jeju International Airport is packed with passengers waiting to depart on the afternoon of the 19th, when all aircraft takeoffs and landings were suspended for the English listening test of the 2027 College Scholastic Ability Test. Photo by Park Changwon.
View original imageDuring the same period, the domestic departure lounge at Jeju International Airport was crowded with passengers stranded by schedule changes and the takeoff restrictions, despite it being a weekday afternoon, and most seats were occupied.
On the apron and taxiways near Gate 9, aircraft with passengers already on board also remained in place, waiting to enter the runway and receive takeoff clearance.
On the afternoon of the 19th, aircraft carrying passengers waited for takeoff clearance on the apron and taxiways at Jeju International Airport during the flight restriction period for the CSAT English listening test. Photo by Park Changwon.
View original imageAircraft already in flight also circled and waited at altitudes of at least 3 km above the ground under the control of air traffic authorities.
The real-time aircraft tracking service Flightradar24 showed flight paths of aircraft unable to approach Jeju International Airport during the landing restrictions, circling in loops over nearby areas, including waters east of Jeju.
That day, 7,414 students took the test at 16 test centers in Jeju: 12 in Jeju City and four in Seogwipo.
Jeju International Airport is particularly close to test centers in urban areas, so aircraft noise during takeoffs and landings can have a significant impact. During the restrictions that day, the Ministry of Land, Infrastructure and Transport prohibited all flights nationwide, including those by helicopters and light aircraft, as well as flights by drones that had received prior approval.
Hot Picks Today
"Two Spend 500,000 Won in a Flash, Yet Wait Two Hours?" ... 'Dreamland' Shunned by Kids and Foreign Tourists
- The Era of Getting 200 Million Won After 30 Years Is Over... A Japanese Bank's "Perpetual Department Head" Who Just Clocked In Cries Out
- Spain Hit by Its Worst Tragedy... Lee Kangin, Moreno and Real Madrid Join Soccer World in Mourning
- They Said, “Make It Your Home for Life” - Then Suddenly Kicked 200 Passengers Off... What Happened to the Around-the-World Cruise?
- "130 Rice Bowls Sold Out in a Day"... 'Unfiltered Face' Adds 8 Million Won to Night Market Sales: China's Bungeunwoo
When the restrictions were lifted at 1:40 p.m., the waiting aircraft resumed takeoffs and landings in sequence.
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.