Naengjeong-ri and Tandong-ri in Gwanin-myeon: 6.16 million square meters

Public inspection through November 13

Restrictions planned for three years from official designation

To be lifted early if the special zone is designated

Pocheon City, Gyeonggi Province (Mayor Baek Younghyun), is moving to restrict development permits in the Naengjeong-ri and Tandong-ri areas of Gwanin-myeon, designated as the proposed site for a Peace Economy Special Zone. The measure aims to prevent indiscriminate construction and changes to land use driven by expectations surrounding the zone’s development.

A view of Pocheon City Hall. Photo courtesy of Pocheon City.

A view of Pocheon City Hall. Photo courtesy of Pocheon City.

View original image

Pocheon City announced on October 30 that it will hold a public inspection of its proposal to designate 6,166,833 square meters in Naengjeong-ri and Tandong-ri, Gwanin-myeon, as a development-permit-restricted area through November 13.


The city is pursuing the designation in view of possible changes to zoning, land-use districts and development-permit standards during the future designation of the Peace Economy Special Zone and the preparation of its development plan. The aim is to reduce potential property losses for residents by preventing situations in which newly built structures or installations must be demolished after being used for only a short time.


The restriction is planned to remain in effect for three years from the date the restricted area is officially designated. However, if the Peace Economy Special Zone is designated and officially announced before the period ends, the development-permit restrictions will be lifted.


The main activities subject to restrictions include constructing buildings and installing structures, altering land, extracting earth and stone, and subdividing land. The restrictions will also cover storing items for one month or longer in green areas, management areas and natural environment conservation areas.


The city plans to exempt subdivisions of lots with existing buildings, the installation of public facilities, activities undertaken for public benefit by the state or local governments, and activities for disaster prevention and recovery or to ensure safety. Changes to land for farming purposes within a certain scope will also be allowed as an exception. However, even for farming purposes, cutting into or piling up soil by 50 centimeters or more will be subject to restrictions.


Inspection documents and related maps are available at Pocheon City’s Advanced Defense Industry Division and the Gwanin-myeon Administrative Welfare Center. Residents and other interested parties may submit their opinions in writing during the inspection period by completing the opinion submission form available at either location.



A Pocheon City official said, "This measure aims to prevent indiscriminate development at the proposed site for the Peace Economy Special Zone and lay the groundwork for planned land use. We will proceed smoothly with preparations for the zone’s designation while minimizing inconvenience to residents and unnecessary property losses."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing