Additional Costs and Safety Concerns Cited After Ground and Water Depth Surveys
14 Billion Won to Link Forest Paths and Lakeside Walkways; Construction Begins in 2027

Damyang County has decided to build a circular ecological exploration trail connecting the entire Damyang Lake, instead of constructing a pedestrian bridge across the lake. After conducting investigations into ground conditions, water depth, and flood levels, it was found that building the pedestrian bridge would require additional costs, prompting a change in the project direction.


On September 30, Damyang County in the Jeonnam-Gwangju Integrated Special City announced that it would proceed with the "Damyang Lake Area Ecological Exploration Trail Project" focusing on a circular trail.

Aerial perspective of the "Damyang Lake Ecological Exploration Trail Project." Provided by Damyang County

Aerial perspective of the "Damyang Lake Ecological Exploration Trail Project." Provided by Damyang County

View original image

Damyang County had originally considered constructing a temporary "Mireu Bridge" across Damyang Lake. However, after detailed ground surveys and working designs to examine the water depth, ground structure, and flood levels, it was determined that additional equipment and foundation work costs would be required to ensure safety. Considering both the project budget and safety, the county decided to abandon the pedestrian bridge-centered plan and instead create a circular trail by connecting fragmented forest paths and lakeside promenades around Damyang Lake, extending the route to nearby villages and Yongmaru-gil.


The total project cost is 14 billion won. The plan includes installing a floating walkway offering views of the Damyang Lake waterscape and artificial waterfall, as well as nighttime lighting, and upgrading safety facilities along the entire trail. Rest areas such as parking lots and waterfront parks will be created in phases to extend visitor stays and expand routes to nearby villages and commercial districts.



On September 22, Damyang County held a residents' briefing session at the Yongmyeon office to explain the background of the project changes and the major plans, gathering feedback from local residents and village leaders. The county plans to consider reflecting residents' suggestions in the basic and detailed designs, consult with relevant agencies, and commence construction in 2027, with completion targeted for 2029.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing