Gyeonggi Province Moves Forward with Dobongsan~Okjeong Metropolitan Railroad Construction
Transition to Temporary Station; Service to Resume on October 31

Jangam Station on Seoul Subway Line 7 will be completely closed for one month from October 2 to October 30, 2026. This shutdown is necessary as part of the construction of the Dobongsan~Okjeong Metropolitan Railroad, which requires the relocation to a temporary station and test operations during the establishment of the new Jangam Station. During this period, Line 7 trains will only operate up to Dobongsan Station, the station before Jangam.

Dobongsan~Okjeong Metropolitan Railroad Route Map. Provided by Gyeonggi Province

Dobongsan~Okjeong Metropolitan Railroad Route Map. Provided by Gyeonggi Province

View original image

On September 7, Gyeonggi Province announced its 'Jangam Station Closure and Alternative Transportation Plan.' To minimize inconvenience for residents, the province will operate a free shuttle bus service between Dobongsan Station Transfer Center, the main gate of Dobong Depot, and Jangam Station Bus Stop from 5 a.m. to midnight. The shuttle interval will be every 7 to 15 minutes on weekdays, and every 10 to 20 minutes on weekends and holidays.


Additionally, more staff will be deployed at Dobongsan Station to guide passengers to the shuttle bus boarding point. Gyeonggi Province, Uijeongbu City, and Yangju City plan to notify the public in advance of the closure and alternative transportation options through their websites and banners.


Currently, Jangam Station is operating as a temporary facility inside the Dobong Depot. In accordance with the Dobongsan~Okjeong Metropolitan Railroad construction, the province plans to demolish the existing station and build a new one within the depot. During construction, a temporary station will be set up on the site next to the current entrance to continue train operations.


However, Gyeonggi Province explained that a one-month closure is inevitable because facility inspections and trial operations must be conducted before the temporary station can officially open.


The preliminary inspection of the temporary Jangam Station will begin on September 21. Facility inspections by sector, including tracks, signaling, and communications, will be conducted until September 30. On October 2, the first day of closure, the tracks leading to the temporary station will be connected to the existing tracks. By October 24, the transfer and joint inspection of the facilities will be completed, along with any necessary improvements. From October 25 to October 30, the train operation system will be tested in real-time operation mode. The temporary Jangam Station is scheduled to open on October 31.

Notice for Free Shuttle Bus Service between Dobongsan Station Transfer Center, Dobong Depot Main Gate, and Jangam Station Bus Stop. Provided by Gyeonggi Province

Notice for Free Shuttle Bus Service between Dobongsan Station Transfer Center, Dobong Depot Main Gate, and Jangam Station Bus Stop. Provided by Gyeonggi Province

View original image

The Dobongsan~Okjeong Metropolitan Railroad is a single-track light rail project stretching 15.1 kilometers from Seoul's Dobongsan Station, passing through Uijeongbu's Jangam and Tapseok Stations, and connecting to Goy-eop District in Yangju. The project includes three stations and a total project cost of 893.5 billion won. As of the end of August, the construction progress rate is 62.44 percent.



Park Youngshin, Head of Rail Construction at Gyeonggi Province, stated, "This closure is an essential step to ensure the safety of the temporary Jangam Station and to continue building the new station. We will work closely with the Seoul Metropolitan Government and Seoul Metro to minimize the construction period and will operate free shuttle buses to reduce inconvenience for passengers."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing