Emergency Repairs for Aging Pavement and Facilities
13 km Closed from 9:00 a.m. to Midnight
Vehicles Toward Chuncheon Must Exit at Yecheon IC
Re-entry via National Road No. 28 to Yeongju IC

A 13-kilometer stretch of the Jungang Expressway, running from Yecheon IC to Yeongju IC in the direction of Chuncheon, will be fully closed for 15 hours on September 9, from 9:00 a.m. to midnight.


On September 2, Korea Expressway Corporation Daegu Gyeongbuk Headquarters announced that all lanes of this section will be completely closed both day and night due to emergency maintenance work for resurfacing and repairing aging pavement and facilities along the Jungang Expressway.

Blocked Sections and Detour Roads <br>[Photo by Korea Expressway Corporation Daegu Gyeongbuk Headquarters]

Blocked Sections and Detour Roads
[Photo by Korea Expressway Corporation Daegu Gyeongbuk Headquarters]

View original image

This project is aimed at intensively repairing deteriorated expressway pavement and various facilities. Rather than partially closing lanes over a long period, the full closure method was chosen to shorten the duration of construction and ensure the safety of both workers and drivers.


The control period will last from 9:00 a.m. to midnight on September 9. During this time, entry onto the Jungang Expressway toward Chuncheon via Yecheon IC will not be allowed, and vehicles traveling in that direction must exit the expressway at Yecheon IC.


Detouring vehicles should exit at Yecheon IC and use National Road No. 28 to re-enter the Jungang Expressway toward Chuncheon at Yeongju IC.


Korea Expressway Corporation will utilize Variable Message Signs (VMS) and other means to provide drivers with advance information about detour routes and traffic control in order to minimize congestion and inconvenience caused by the complete closure.


Given that the closure will last for 15 hours and include rush hour periods, drivers using the Yecheon–Yeongju section are advised to allow extra time for travel and to check the status of detour routes in advance.


Yoo Hosik, Head of Korea Expressway Corporation Daegu Gyeongbuk Headquarters, stated, "We had no other choice but to implement the full closure in order to repair aging facilities quickly and safely," adding, "As inconvenience is expected, we ask for drivers’ active cooperation in using detour routes and driving safely."



While a full expressway closure causes inconvenience to users, it is necessary both to repair aging facilities and ensure worker safety. The corporation must focus its administrative efforts not only on managing the closure itself but also on closely monitoring traffic flow along detour routes to minimize secondary congestion and safety incidents.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing