Inspection of Key Expanded Facilities
Emphasis on Thorough Water Quality Management and Stable Supply System

Kim Yooncheol, County Governor of Hapcheon, visited the site of the Hapcheon Water Purification Plant expansion following the completion of the Hapcheon District Rural Living Water Development Project, inspecting key facilities and their operational status.


According to Hapcheon County in Gyeongnam Province, Governor Kim visited the Hapcheon Water Purification Plant on the 28th and inspected the expanded purification facilities and related equipment, reviewing the operation and management of the plant.


This on-site inspection was conducted to verify that the main facilities of the plant expansion project had been installed and operated according to plan, and to assess the water supply infrastructure’s readiness to respond to future increases in demand for living water.


Photo provided by Hapcheon County] Yoonchul Kim, Governor of Hapcheon County, visited the site of the Hapcheon Water Purification Plant expansion on the 28th following the completion of the Hapcheon District rural living water development project to inspect the major facilities and operational status.

Photo provided by Hapcheon County] Yoonchul Kim, Governor of Hapcheon County, visited the site of the Hapcheon Water Purification Plant expansion on the 28th following the completion of the Hapcheon District rural living water development project to inspect the major facilities and operational status.

View original image

At the site, Governor Kim checked the newly built filtration basin, water reservoir, and management building in sequence, examining the water purification process and the maintenance of the facilities. He also urged related public officials and project stakeholders to perform ongoing inspections and ensure the proper operation and management of the facilities.


Governor Kim particularly emphasized that, as water purification facilities are essential infrastructure directly tied to residents’ daily lives, it is crucial to thoroughly manage water quality and facility maintenance, and to ensure a stable water supply system through impeccable oversight.


With this project now completed, the treatment capacity of the Hapcheon Water Purification Plant has increased from the previous 10,000 cubic meters per day to 11,500 cubic meters per day, securing an additional processing capacity of 1,500 cubic meters per day. The county expects this will strengthen the foundation for responding to future rises in living water demand and for the stable supply of municipal water.


The Hapcheon District Rural Living Water Development Project has been promoted from 2022 to 2026 to address the growing demand for living water in rural areas and to establish a stable tap water supply infrastructure.


The total project cost was 10 billion won, with major initiatives including the expansion of one filtration basin (with a filtration area of 500 square meters), one water reservoir (3,000 cubic meters), and the construction of a new management building (with a floor area of 410 square meters).


Governor Kim Yooncheol stated, “The water purification plant is fundamental infrastructure that directly affects residents’ daily lives, so stable operation and water quality management are crucial. We will continue to inspect the new facilities to ensure they perform their function and work to maintain a stable tap water supply system.”


Hapcheon County plans to continuously manage the local living water supply conditions secured through this expansion project and respond flexibly to changes in water supply demand.



The plant expansion is significant not only as an extension of infrastructure, but also in that it has secured a stable water supply system directly impacting the daily life of residents. For these improvements to be meaningfully felt by residents, efficient operation of the expanded facilities and thorough management of both water quality and facilities must follow.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing