Korail Gwangju Headquarters Strengthens Emergency Response Capabilities Ahead of SR Integration
The Korail Gwangju Headquarters announced on August 27 that, ahead of the institutional integration of Korail and SR scheduled for September 1, it had conducted the “SRT High-Speed Train Rescue Training” on the Honam Railroad Vehicle Maintenance Team’s test run track to strengthen emergency response capabilities for high-speed trains.
Korail Gwangju Headquarters conducted rescue training at the Honam Railway Vehicle Maintenance Team's test track to strengthen emergency response capabilities for high-speed trains ahead of SR's institution integration. Photo by Korail Gwangju Headquarters
View original imageThis training went a step beyond the existing KTX-focused response system and, in preparation for the post-integration operation of SRT high-speed trains starting in September, simulated a situation in which the train becomes inoperable during service. A diesel locomotive was deployed to safely tow the affected SRT train.
More than 70 participants attended the training, including about 50 members of the Korail Gwangju Headquarters and personnel from the Honam Railroad Vehicle Maintenance Team. Through the exercise, they mastered emergency procedures tailored to the unique features of the SRT high-speed train and verified rescue protocols on-site to address unforeseen variables that may arise during locomotive connection and towing.
Hot Picks Today
"Two Spend 500,000 Won in a Flash, Yet Wait Two Hours?" ... 'Dreamland' Shunned by Kids and Foreign Tourists
- The Era of Getting 200 Million Won After 30 Years Is Over... A Japanese Bank's "Perpetual Department Head" Who Just Clocked In Cries Out
- Spain Hit by Its Worst Tragedy... Lee Kangin, Moreno and Real Madrid Join Soccer World in Mourning
- They Said, “Make It Your Home for Life” - Then Suddenly Kicked 200 Passengers Off... What Happened to the Around-the-World Cruise?
- "130 Rice Bowls Sold Out in a Day"... 'Unfiltered Face' Adds 8 Million Won to Night Market Sales: China's Bungeunwoo
Taehoon Kim, head of the Gwangju Headquarters, stated, “Our top priority is to alleviate passengers’ concerns and provide a safe rail service in preparation for integrated operations.” He added, “We will continue to carry out field-based training so that we can respond swiftly and accurately to any emergency situations in the future.”
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.