Strengthened Management of Small-Scale Livestock and Individual Sewage Treatment Facilities
Integration of Biogasification and Wastewater Reuse Projects into the Total Load Management Plan

Icheon City in Gyeonggi Province is reducing the discharge of water pollutants in order to proactively secure development capacity needed for future urban development.

The exterior view of Icheon City Hall. Provided by Icheon City

The exterior view of Icheon City Hall. Provided by Icheon City

View original image

On August 10, the city announced that it would launch the “Phase-by-Phase Identification of Water Pollution Load Reduction Sources” initiative to smoothly advance various development projects and establish a sustainable, eco-friendly urban foundation.


The Total Water Pollution Load Management System sets allowable pollutant discharge limits for rivers and manages these limits so they are not exceeded. When the city reduces pollutant discharges and secures reductions, it gains corresponding capacity to pursue regional development projects.


As an initial step, the city will monitor small-scale livestock wastewater discharge facilities with a daily treatment capacity of less than 200 cubic meters, which have been falling under regulatory blind spots. For individual sewage treatment facilities with a daily capacity of less than 25 cubic meters installed at sites subject to allocation consultations, Icheon plans to strengthen effluent concentration controls and develop more effective measures to reduce pollutant loads.


The reduction in pollutant loads achieved by the integrated biogasification facility and the wastewater reuse project—currently scheduled for completion by 2030—will be incorporated into the third-phase (2031–2040) Total Water Pollution Load Management Plan.


The city anticipates that by converting organic waste into energy and reusing wastewater, it will be able to achieve large-scale reductions of water pollutants, thereby stably securing the development capacity needed for medium- and long-term urban development projects set to proceed after 2030.



Kim Mira, Head of the Environmental Protection Division, stated, “In the short term, by managing small-scale livestock facilities and individual sewage treatment systems, we will ensure compliance with the second-stage implementation assessment. In the medium- and long-term, we will link post-2030 development projects to the third-phase total load plan to continuously secure momentum for future development. We will do our utmost to make Icheon a city where environmental conservation and regional development reinforce each other in a virtuous cycle.”


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing