Hoban Construction Develops AI Technology for Automatic Ready-Mixed Concrete Calculation... Boosts On-Site Productivity
Technology Validation Underway at Two Sites
Nationwide Expansion Planned for Next Month
Hoban Construction announced on July 28 that it has developed an AI-based 'Ready-Mixed Concrete Automatic Quantity Calculation Technology' and is applying it to pilot sites to improve the efficiency of ready-mixed concrete placement work.
The AI-based ready-mixed concrete automatic quantity calculation technology is a system in which AI automatically calculates the amount of ready-mixed concrete required for structural placements, such as basements. The AI automatically analyzes blueprints uploaded to the server, and when the site technician marks the placement sections on the processed blueprints, the required amount of ready-mixed concrete is calculated in real-time.
Hobahn Construction site engineers are receiving training on using an AI-based ready-mix concrete automatic quantity calculation program. Provided by Hobahn Construction
View original imageIn the past, site technicians manually checked blueprints and calculated the quantity of ready-mixed concrete required for each placement section. This meant that less experienced technicians often spent significant amounts of time on these calculations. If the calculated quantity differed from the actual amount needed, it led to inefficiencies such as placement delays or excess concrete remaining at the site.
However, by using this AI-based technology, site technicians can establish accurate ordering plans for ready-mixed concrete based on automatically calculated data. Hoban Construction expects this technology to deliver benefits such as reduced working hours, decreased concrete loss, and improved process operation efficiency.
This month, Hoban Construction is conducting technology validation at two Hoban Summit sites. After collecting and reflecting on user feedback from the sites, the company plans to upgrade the system's features and expand its application to construction sites nationwide next month.
Hot Picks Today
"End of Samsung and SK Hynix’s Dominance?" CXMT Soars 466% on IPO Debut... Founder’s Wealth Jumps 300%
- "Strong Earthquake Causes Partial Collapse of Kyushu Shopping Mall... Many Reportedly Trapped Inside"
- "Voter Numbers Misentered"... Vote Statistics Manipulated in Gimpo, Uiwang, and Jincheon During June 3 Local Elections
- Climate Ministry Union: "Death of Official in 30s Result of Demanding Only Performance"
- Prosecution Requests Arrest Warrant for Entertainment Agency CEO Chagawon on Multi-Billion Won Fraud Charges
Hoban Construction aims to gradually expand the AI-based quantity calculation system and further upgrade its construction quantity calculation framework. A representative from Hoban Construction stated, "We will continue to introduce AI technologies that can reduce the workload of on-site personnel and increase the accuracy of process and cost management."
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.