A Large-Scale Complex with 1,400 Units Across 25 Floors
933 Units Offered Through Public Sales

On July 3, DL E&C announced that it has opened the housing exhibition hall for 'E-Pyunhansesang Bundang First Village,' which will be built in the Dongwon-dong area of Bundang-gu, Seongnam, Gyeonggi Province, and has officially started sales.


E-Pyunhansesang Bundang First Village is a residential complex supplied to (prospective) newlywed couples and single-parent households who meet the requirements for the Newlyweds Hope Town program. The complex will consist of 15 buildings, ranging from four basement levels to 25 floors above ground, with a total of 1,400 units. Of these, 467 units will be long-term rental units overseen by Korea Land and Housing Corporation (LH), while the remaining 933 units will be offered through public sales.

Perspective view of E-Pyeonhansesang Bundang First Village. Provided by DL E&C

Perspective view of E-Pyeonhansesang Bundang First Village. Provided by DL E&C

View original image

The complex will feature small- and medium-sized units with exclusive areas of 60 square meters or less. The specific public sale housing types are as follows: 274 units of 51㎡ Type A, 348 units of 55㎡ Type A, 134 units of 55㎡ Type B, 167 units of 59㎡ Type A, and 10 units of 59㎡ Type T (terrace type).


The units are mainly oriented to the southwest and southeast, with plate-type units making up more than 82% of the complex. Inside each unit, DL E&C’s specialized floor plan design, 'C2 House,' has been applied, and space utilization and storage efficiency have been enhanced through features such as expanded kitchen art walls, wide kitchen windows, and entrance pantries, varying by type.


In line with the characteristics of the Newlyweds Hope Town, the complex will include a two-story public daycare center and an expanded community childcare center. In addition, residential convenience for households with infants and young children has been improved through designs that reduce inter-floor noise and the use of thick floor soundproofing materials.



Move-in is scheduled for February 2029. Applications for the main draw (new applicants) will be accepted over two days from July 20 to July 21, with successful applicants to be announced on July 31. Document submissions will be accepted from August 7 to August 17, and official contracts will be conducted over ten days from November 4 to November 13.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing