Ministry Approves Second Urban Railroad Network Plan


10 Main Lines, Including Busan-Type Express Railway, Enter Full-Scale Development

The blueprint for Busan’s future urban railroad network, connecting Gadeokdo New Airport, North Port, Osiria, and Jeonggwan, has been finalized.


The Busan Metropolitan Government announced that the ‘Second Busan Metropolitan City Urban Railroad Network Construction Plan (2026–2035)’ received final approval from the Ministry of Land, Infrastructure and Transport on June 26, following deliberation by the National Transport Committee.


This construction plan is a legally mandated roadmap that will determine the direction of Busan’s urban railroad development over the next ten years. It has been formulated to reflect changes in urban space and transportation demand, including the construction of Gadeokdo New Airport, North Port redevelopment, Eco Delta City, and the development of Centum 2 District.


The plan includes 10 main lines and 4 candidate lines.


The main lines, with a total length of 145.66 kilometers, are as follows: the Busan-type express railway connecting Gadeokdo New Airport to Myeongji, Busan Station, Centum, and Osiria; the Busan Port Line linking the original city center and North Port redevelopment area; Jeonggwan Line; Songdo Line; Gangseo Line; Gijang Line; Yeonsan–Second Centum Line; Osiria Line; express upgrades for Urban Railroad Line 1; and express upgrades for Line 2.


The candidate lines include the Oryukdo Line, the branch line connecting Jurye to Busan Station, the East Busan Line, and the Deokcheon–Choeup–Seomyeon Line.

The city selected lines with a benefit-cost ratio (B/C) of 0.7 or higher or a comprehensive evaluation (AHP) score of 0.5 or above as main projects. Although the candidate lines currently fall short in economic feasibility, the city plans to review their potential based on future urban development and changes in transportation conditions.


With the Ministry's approval, Busan plans to expedite follow-up procedures for each line. In particular, the city will officially begin the Busan Port Line project by applying for a preliminary feasibility study in the second half of this year. It is also considering conducting the feasibility study and establishing the basic plan simultaneously to minimize the project period as much as possible.


At the same time, the city will review introducing branch lines connecting Munhyeon–Citizen’s Park and Daeyeon–Oryukdo, centering on the Busan Port Line, in order to build an urban railroad network that links major hubs in the original city center and coastal areas.


Since the Ministry of Land, Infrastructure and Transport approval application in June last year, the current construction plan has passed through city council feedback, public hearings involving citizens and experts, consultations with related organizations, and the review of the Urban Transportation Policy Working Committee, before finally being deliberated by the National Transport Committee.



Lim Kyungmo, Director of Urban Innovation and Balanced Development at Busan Metropolitan Government, said, “With the approval of this construction plan, the blueprint for Busan’s urban railroad network over the next decade is now set. We will continue to expand the urban railroad network to improve convenience for citizens and work toward establishing Busan’s future transportation infrastructure.”

Busan Urban Railway Network Construction Plan Map.

Busan Urban Railway Network Construction Plan Map.

View original image


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing