Visit to the Sports Complex, Redevelopment Zone, and New District Office Construction Site

On the afternoon of the 12th, at the Gangbuk Sports Complex swimming pool in Gangbuk District, Seoul, Jung Changsoo, the mayor-elect of Gangbuk District, visited the empty basement pool. One section of the ceiling still showed exposed finishing and insulation materials that had been removed. This was the site of the April 3rd incident, when the insulation of the perforated ceiling panel detached.


Looking up at the ceiling, Jung stated, "We need to examine every stage, from design, construction, and supervision, to defect repair management." He added, "We must first accurately identify the root cause. The defect repair management ledger is often filled out just for formality, but it should not be just paperwork; we need to ensure actual inspections are conducted."

On the 12th, Jung Changsoo, the mayor-elect of Gangbuk District, who visited Gangbuk Sports Complex, emphasized "safety" in an interview with The Asia Business Daily. Provided by Gangbuk District Office.

On the 12th, Jung Changsoo, the mayor-elect of Gangbuk District, who visited Gangbuk Sports Complex, emphasized "safety" in an interview with The Asia Business Daily. Provided by Gangbuk District Office.

View original image

The district's construction officer standing nearby appeared tense. Although Jung has not yet taken office, his pointed remarks during this site visit were brief but significant.


During the on-site briefing, the construction officer explained the sequence of events: steam from the swimming pool penetrated the interior of the ceiling through the perforated panel, corroding the fasteners and causing the insulation to detach. Another cause cited was the lack of ventilation above the ceiling, as the air conditioning system was only installed inside the pool area. The district is expediting the repair work, aiming to allow residents to use the swimming pool again within two months.


Jung emphasized, "Although it has been three years, the problem occurred too soon. Even failures are assets. The key is to prevent them from happening again."


"We will sequentially reveal 100 changes for Gangbuk"


After completing the site inspection, Jung sat down for an interview with the reporter. He began by saying, "The sense of responsibility is even greater now than before I was elected." He shared, "I have trouble sleeping at night because I feel such a strong obligation to meet the expectations of the residents." Starting his term on July 1st, Jung said he plans to unveil "100 changes for Gangbuk" one by one, beginning with his inauguration ceremony.


The most urgent issue Jung pointed to in Gangbuk District was transportation. He explained, "The main reason the population in Gangbuk is declining and the area is stagnating is because commuting is difficult. Transportation is the most urgent issue, and urban renewal is also needed to improve the residential environment."


Jung identified his top priority for the four-year term: installing escalators and elevators in both directions at the four entrances of three subway line 4 stations within the district. He stated, "Whatever it takes—whether it's persuading the Seoul Metropolitan Government or securing the necessary funding—I will make it happen, because this is the policy residents will feel most directly."


He said, "I do not have a driver's license, so I only use public transportation. That is why I deeply understand the sincere needs of those who rely on public transit."


Jung also expressed confidence in attracting the Dongbu light rail line. He stated, "Although the plan was omitted from the original proposal in Seoul's announcement yesterday (the 11th), the city said it would 'actively consider' it. It's only a matter of time before it happens." He further explained, "As a local government head who has personally conducted cost-benefit analysis (BC analysis), I am not just making vague requests. I will persuade the Seoul Metropolitan Government with the demand from 64,000 new households moving in."

Jung Changsoo, Mayor-Elect of Gangbuk District (right), is taking notes while listening to an explanation from a responsible public official at the Gangbuk Sports Complex swimming pool on the 12th. Photo by Minjin Kim.

Jung Changsoo, Mayor-Elect of Gangbuk District (right), is taking notes while listening to an explanation from a responsible public official at the Gangbuk Sports Complex swimming pool on the 12th. Photo by Minjin Kim.

View original image

"Budget reduction is not just about squeezing expenses"


Jung's background is unique among district chiefs. He began his career in civic organizations such as the Citizens' Coalition for Economic Justice and has spent nearly 28 years researching government budgets, local finance, and administrative innovation—making him a public finance expert. He planned the "Bottomless Jar Award," presented to organizations that waste budgets at Citizens' Action Together, which resonated nationwide. The media has dubbed him "the nation's household finance expert" and "the president's fiscal mentor."


As the head of the Korea Institute of Public Finance, he has conducted extensive research for local governments, legislative bodies, and public institutions. He has served as an expert member of the National Planning Advisory Committee under the Lee Jaemyung administration, as a member of the Public Institution Management Evaluation Team at the Ministry of Economy and Finance, and as a member of the Central Environmental Policy Committee at the Ministry of Environment.


Given this background, there are naturally high expectations for Jung as a "budget expert district mayor." However, Jung drew a clear line when it came to the term "budget reduction." He emphasized, "No matter how hard you squeeze a dry towel, there is only so much you can get. Real budget reduction is not about cutting welfare benefits, but about making work more efficient and, in the long term, growing the local economy to increase tax revenue."


When asked about his governing philosophy, Jung cited "resident happiness" as his top priority, and emphasized "safety" as a prerequisite. He said, "You cannot be happy without being safe. Overreacting is better than responding too late." That seemed to be the mindset that brought him to the swimming pool that day. On the same day, Jung also visited the Mia 3rd Redevelopment Zone and the construction site for the new district office building after his visit to the Gangbuk Sports Complex.



*Defect repair management ledger: A register that records and maintains details about defects, repairs, and inspections for a construction project.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing