A total of 805 units in A7 and A8 blocks
Special supply begins on the 16th

Hoban Construction announced on June 10 that it will officially open its model home for "Hoban Summit Advanced District 3," located in A7 and A8 blocks of the Advanced District 3 in Gwangju Metropolitan City, and begin full-scale sales.


"Hoban Summit Advanced District 3" will be built on A7 and A8 blocks, comprising a total of 805 units. The A7 block will consist of one basement level and up to 20 above-ground floors, across 5 buildings, exclusively offering 356 units of 84 square meters each. This includes 262 units of the 84㎡A type and 94 units of the 84㎡B type.

The rendering of Block A7 in Hoban Summit Advanced District 3. Provided by Hoban Construction

The rendering of Block A7 in Hoban Summit Advanced District 3. Provided by Hoban Construction

View original image

The A8 block will also have one basement level and up to 20 above-ground floors, with 6 buildings offering 449 units ranging from 117 to 135 square meters. This includes 221 units of 117㎡A, 77 units of 117㎡B, and 151 units of 135㎡. Since these are supplied within a public housing site, the price ceiling system applies to the complex.


Hoban Summit Advanced District 3 offers convenient access to downtown Gwangju and major hubs in South Jeolla Province via the Honam Expressway, National Route 13, and Bitgoeul Boulevard. Infrastructure expansion is underway, including a new road connecting the Sangmu District and the Advanced Industrial Complex, scheduled for completion in 2028, and an access road to Advanced District 3 expected to be completed by 2030. With the planned opening of the Gwangju Metro Line 2 GIST Station in 2029 nearby, public transportation options are also expected to improve.


Additionally, the location offers excellent convenience for those working nearby. Advanced District 3 is being developed as a hub for advanced industries, with the National AI Data Center, AI-related companies, and research institutes situated in the area. The National Cardiovascular and Cerebrovascular Center is also scheduled for completion in 2029. Within a 7-kilometer radius, there are six major industrial complexes, including the Gwangju Advanced Science National Industrial Complex.


The educational infrastructure is well established. Sites for kindergartens, elementary, middle, and high schools are planned near the complex, making it possible for children to walk to school. The GIST-affiliated AI Gifted Academy, scheduled to open in March next year, is also nearby.


The complex has been designed with a south-facing orientation and wide spacing between buildings to maximize sunlight, ventilation, and a sense of openness. Community facilities will include a fitness center, golf practice range, screen golf center, small library, and cultural center. Each block will also feature amenities such as a residents' café, kids' station, and education center.


The sales schedule will begin on the 15th with a special supply for relocation institutions (industrial complex) in the A8 block, followed by another special supply on the 16th, and then first-priority applications on the 17th and second-priority applications on the 18th. Move-in is scheduled for September 2028 for the A7 block and October 2028 for the A8 block.



A sales representative from Hoban Construction stated, "'Hoban Summit Advanced District 3' is a complex where both AI industry infrastructure and residential functions are developed together in a self-sufficient city location, and the price ceiling system is also applied."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing