Full-Scale Launch of the 5th Island Comprehensive Development Plan

10-Year Roadmap to Begin in 2028

Improved Living Conditions Backed by 533.5 Billion Won Invested Over 40 Years

Wando-gun, South Jeolla Province, is set to officially begin formulating the “5th Island Comprehensive Development Plan” to overcome the risk of population extinction and ensure sustainable island development, as the “4th Island Comprehensive Development Project” nears completion.


The Island Comprehensive Development Project is a national initiative implemented every 10 years since 1988 under the “Island Development Promotion Act.” Its aim is to improve the underdeveloped living environment of island regions and promote increased income and welfare for residents.

Overview of Seonchang-ri Dock in Bogil-myeon, the target area of the 5th Island Comprehensive Development Project

Overview of Seonchang-ri Dock in Bogil-myeon, the target area of the 5th Island Comprehensive Development Project

View original image

Currently, Wando-gun is a representative island region in Korea, comprising 265 islands (54 inhabited and 211 uninhabited). However, the region is facing a serious crisis, having recently been designated by the Ministry of the Interior and Safety as an “area at high risk of local extinction” due to a sharp population decline and rapid aging.


Accordingly, the importance of the Island Comprehensive Development Project has grown more than ever, as it is essential to fundamentally improve living conditions on the islands and secure long-term growth engines. Since launching the first project in 1988, the county has injected a total of 533.5 billion won in large-scale national funding into its island regions over the past 40 years, spanning up to the current 4th project.


By period, the 1st project (1988–1997, 43.5 billion won) marked the initial step in establishing basic infrastructure in island areas. During the 2nd project (1998–2007, 113 billion won), critical living infrastructure such as roads and docking facilities was significantly expanded.


Next, a record-high 259 billion won was invested in the 3rd project (2008–2017), which led to increased resident income and improvements in welfare. The ongoing 4th project (2018–2027, 118 billion won) has laid the foundation for improved living conditions and revitalization of the islands. The new “5th Island Comprehensive Development Plan” being prepared by Wando-gun will be a mid- to long-term roadmap carried out over 10 years, from 2028 to 2037.


In drawing up this plan, the county intends to actively collect and reflect the candid opinions of residents living on its 54 inhabited islands. Moving beyond simple infrastructure expansion, the vision is to discover effective projects that can breathe new life into island villages facing extinction. The 5th plan will be finalized after gathering resident feedback and completing the planning stage, and will receive final approval from the Ministry of the Interior and Safety in February 2027.



An official from Wando-gun said, “Through this 5th plan, we will secure the maximum possible budget, improve the living environment for island residents, and contribute to greater resident welfare and economic revitalization.”


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing