Super Heavy Launch Vehicle, 124 Meters Tall
Countdown Reached, But Launch Delayed by a Day Due to Technical Issues

SpaceX's Upcoming IPO
Investors Closely Watching the Test Flight
Investment Firm: "A Company That Has Grown Through Failure"

The launch of Starship 'Version 3 (V3)', the next-generation super heavy launch vehicle developed by SpaceX, the American space and aerospace company led by Elon Musk, has been postponed. The delay was attributed to technical issues, and the launch is now expected to take place as early as May 23. With SpaceX scheduled to be listed on the Nasdaq in mid-June, there is analysis that the outcome of this test flight could influence the success of its initial public offering (IPO).


SpaceX's next-generation super heavy launch vehicle Starship 'Version 3 (V3)' waiting on the launch pad at Starbase in Texas on the 21st (local time). V3 attempted to take off on this day, but the launch was postponed by one day. Photo by Reuters Yonhap News

SpaceX's next-generation super heavy launch vehicle Starship 'Version 3 (V3)' waiting on the launch pad at Starbase in Texas on the 21st (local time). V3 attempted to take off on this day, but the launch was postponed by one day. Photo by Reuters Yonhap News

View original image

On May 21 at 7:30 p.m. local time (8:30 a.m. on May 22, Korea Standard Time), SpaceX attempted the 12th test flight launch of Starship. The launch proceeded up to the countdown stage, but SpaceX abruptly postponed the launch. This is not the first postponement; the launch had already been pushed back once from May 19 to May 21. On this day as well, the launch was delayed by about 30 minutes.


Dan Huot, who was hosting the launch broadcast for SpaceX, cited issues with the Starship's propellant lines, the launch tower sensors, and the water deluge system as reasons for the schedule delay. The water deluge system is designed to spray water onto the launch pad to reduce heat and shock during rocket launches, thereby protecting the launch platform from flame and explosive impacts.


CEO Musk also explained on his social networking service X (formerly Twitter) that "the hydraulic pin securing the launch tower arm did not release properly," adding, "If this issue is resolved tonight, SpaceX will attempt another launch at 5:30 p.m. tomorrow."


When fully assembled, Starship V3 is a super heavy launch vehicle that stands 408 feet (approximately 124 meters) tall. It is equipped with a new engine capable of generating 18 million pounds of thrust. In an investment prospectus released the previous day, the company explained that V3 is "fully reusable and capable of transporting 100 tons of cargo to Earth's orbit, with a rapid reusability cycle designed to rival that of commercial aviation."


Starship is also being used for NASA's Artemis program and next-generation deep space transportation initiatives. For this test flight, a model Starlink satellite will be loaded on board; no astronauts or cargo will be carried.


This flight is regarded as a pivotal event that could sway investor sentiment ahead of SpaceX's IPO scheduled for next month. While the specific IPO fundraising amount has not been disclosed, foreign media outlets such as The Wall Street Journal have suggested that SpaceX could raise approximately $80 billion (about 110 trillion won). The investment industry anticipates that this could become the largest capital raise in U.S. IPO history since the 2019 Saudi Aramco case ($29 billion). The company is expected to achieve a valuation of $1.75 trillion to $2 trillion through this listing.


However, the postponement of this launch is not expected to have a significant impact on the IPO. It is widely recognized that repeatedly testing spacecraft at their operational limits is a fundamental aspect of the space development business. CNN also reported that investors are more focused on whether there will be a 'catastrophic explosion' than on delays themselves. Phil Scully of Valerion Space Ventures, a space-focused investment firm, said, "Starship is only a part of SpaceX's overall business," adding, "Investors are aware that SpaceX has advanced through repeated experiments and failures."



However, SpaceX's space business division is not yet profitable. Last year, this division recorded $4.1 billion in revenue but posted an operating loss of $657 million, with the Starship project being the main reason for the deficit. In contrast, the communications business centered on Starlink generated $11.4 billion in revenue, accounting for 61% of the company's total revenue last year.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing