Kang Byungduck, Prospective Hanam Mayor, and Lee Kwangjae, Prospective Hanam A National Assembly Candidate
Meeting with Land Committee Chair Maeng Sungkyu: Urging Early Construction of Lines 3 and 9, GTX-D via Hwangsan Sageori
Presenting a Blueprint for "All-Directional Connectivity in Hanam" with Extensions to the Wirye–Sinsa Line and New Misa–Wirye Line
Innovative Housing Solutions Including "Youth Housing" Utilizing Vacant Knowledge Industry Centers

Kang Byungduck, prospective candidate for mayor of Hanam from the Democratic Party of Korea, and Lee Kwangjae, prospective candidate for the Hanam A National Assembly by-election, visited the National Assembly to address Hanam's persistent transportation issues and to propose innovative housing solutions for young people.

Kang Byeongdeok, preliminary candidate for mayor of Hanam, and Lee Kwangjae, preliminary candidate for the National Assembly member of Hanam City Gap District, are meeting with the chairman of the Land, Infrastructure and Transport Committee and members of the committee. Provided by preliminary candidate Kang Byeongdeok

Kang Byeongdeok, preliminary candidate for mayor of Hanam, and Lee Kwangjae, preliminary candidate for the National Assembly member of Hanam City Gap District, are meeting with the chairman of the Land, Infrastructure and Transport Committee and members of the committee. Provided by preliminary candidate Kang Byeongdeok

View original image

On April 30, Kang and Lee met with Maeng Sungkyu, Chairperson of the Land, Infrastructure and Transport Committee, and its members at the National Assembly. On May 1, they announced that they had submitted an official proposal outlining key transportation issues and policy tasks for Hanam City.


To prevent severe traffic congestion during the initial move-in period of the Gyosan District, a Phase 3 New Town, Kang strongly urged the prompt commencement of construction for the Hanam sections of Subway Line 3 (Songpa–Hanam Line) and Subway Line 9 (Gangdong–Hanam–Namyangju Line).


In particular, to dramatically enhance accessibility to downtown Seoul, Kang requested that the GTX-D line be included in the Fifth National Railroad Network Construction Plan and called for the swift completion of its preliminary feasibility study. He also formally proposed the idea of routing GTX-D through Hwangsan Sageori, presenting this as a specific alternative to maximize convenience for Hanam residents.


Kang also put forward key railroad pledges to strengthen inter-regional connectivity.


Kang and Lee called for the inclusion of the long-delayed extension of the Wirye–Sinsa Line into Hanam (including the Gam-il District), which has been stalled for 17 years, in the revised Fourth Metropolitan Area Wide-Area Transportation Implementation Plan.


Additionally, they proposed the establishment of a new "Misa–Wirye Line" (tentative name) to connect the areas of Wirye, Gam-il, Old Town, and Misa within Hanam. Kang also suggested securing funding for new rail projects through the development of Choi and Gambuk regions. Furthermore, he included plans to operate a pilot route connecting Incheon Airport and Jamsil by attracting a UAM (Urban Air Mobility) vertiport to Hanam, a future-oriented transportation mode.


Lee Kwangjae emphasized, "The extension to Hanam is a matter of will," adding, "The extension of the Wirye–Sinsa Line should reach as far as Gam-il."


In response, Chairperson Maeng Sungkyu stated, "Before finalizing the Fifth Railroad Network Plan, I will visit the Hanam site together with committee members in the near future," and promised, "We will strive to make reasonable adjustments."

Kang Byungduck, the preliminary candidate for mayor of Hanam, and Lee Kwangjae, the preliminary candidate for the Hanam City Gap constituency, are shouting "Fighting" after meeting with the chairman and members of the National Assembly Land, Infrastructure and Transport Committee. From the left: Assemblyman Son Myungsoo, former Vice Governor of Gyeonggi Province Oh Poo-seok, Kang Byungduck, Democratic Party candidate for mayor of Hanam, Chairman of the Land, Infrastructure and Transport Committee Maeng Sungkyu, Lee Kwangjae, candidate for the Hanam Gap constituency, Assemblyman Bok Kiwang, Assemblyman Han Junho, Assemblyman Jung Junho. Provided by Kang Byungduck, Preliminary Candidate

Kang Byungduck, the preliminary candidate for mayor of Hanam, and Lee Kwangjae, the preliminary candidate for the Hanam City Gap constituency, are shouting "Fighting" after meeting with the chairman and members of the National Assembly Land, Infrastructure and Transport Committee. From the left: Assemblyman Son Myungsoo, former Vice Governor of Gyeonggi Province Oh Poo-seok, Kang Byungduck, Democratic Party candidate for mayor of Hanam, Chairman of the Land, Infrastructure and Transport Committee Maeng Sungkyu, Lee Kwangjae, candidate for the Hanam Gap constituency, Assemblyman Bok Kiwang, Assemblyman Han Junho, Assemblyman Jung Junho. Provided by Kang Byungduck, Preliminary Candidate

View original image

The proposal also includes the establishment of a UAM (Urban Air Mobility) vertiport in Hanam, which is attracting attention as a next-generation advanced transportation option. This is in line with the Ministry of Land, Infrastructure and Transport's K-UAM policy direction and involves plans to operate a pilot route connecting Incheon International Airport, Gimpo Airport, Jamsil, and Hanam.


Kang requested regulatory reforms to allow vacant spaces within centers to be repurposed as youth housing that integrates residential, entrepreneurial, and community functions for proximity between living and work.


Kang stated, "The proposals made in the National Assembly are not only to address Hanam's local issues but also represent a strategic approach to improving the transportation structure of eastern metropolitan Seoul. I am committed to transforming Hanam from a city dependent on Seoul into a self-sustaining, transportation-centric city."



Lee Kwangjae also remarked, "Hanam is the gateway to eastern metropolitan Seoul, but wide-area transportation networks remain insufficient. There is an urgent need for a proactive national response to realize the principle of establishing transportation infrastructure before residential occupancy in the Phase 3 New Towns."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing