Daejeon "Doan Zai Centum Liche" to Offer 1,780 Units for General Sale
More Than 80% of Units Are 84 sqm in Size
Deposit of 10 Million Won Available in Installments and Resale Permitted
GS Engineering & Construction has opened the model home for "Doan Zai Centum Liche," which will be built at 267-3 Yonggye-dong, Yuseong-gu, Daejeon.
The complex will consist of 2 basement levels and up to 42 above-ground floors, with a total of 2,293 units. Of these, 1,780 units—946 units in Complex 1 (Block 26) and 834 units in Complex 2 (Block 30)—will be offered for general sale.
Notably, more than 80% of all units are 84 square meters of exclusive space, a size highly preferred by end-users.
Applications can be submitted via the Korea Real Estate Board's subscription platform, starting with special supply on April 20, followed by first-priority applications on April 21 and second-priority on April 22. Winners will be announced separately for each complex: Complex 1 on April 28 and Complex 2 on April 29, allowing applicants to apply for both complexes.
Doan Zai Centum Liche has adopted a three-installment system for the contract deposit, reducing the financial burden for end-users.
The total deposit is 10%, and with the three-installment system, contracts can be signed with a first deposit of 10 million won.
The third deposit installment is scheduled for November 16, about six months after signing, which minimizes the initial capital burden.
It is also notable that units can be resold before the interim payment.
The complex also boasts an excellent location. It is a transit-oriented development, with the planned Yonggye Station on Daejeon Metro Line 2 tram located about a five-minute walk away. According to a feasibility review report by the KDI Public and Private Infrastructure Investment Management Center, when the line opens in 2028, it will take about 10 minutes to reach Yuseong Spa Station and about 21 minutes to reach Government Complex Station.
A sales representative stated, "Doan Zai Centum Liche is a rare new development being supplied at the completion stage of Doan Phase 2. If Phase 3 development proceeds in the future, we will do our utmost to ensure that this complex serves as a central axis for residential living in the area."
Hot Picks Today
"Two Spend 500,000 Won in a Flash, Yet Wait Two Hours?" ... 'Dreamland' Shunned by Kids and Foreign Tourists
- The Era of Getting 200 Million Won After 30 Years Is Over... A Japanese Bank's "Perpetual Department Head" Who Just Clocked In Cries Out
- Spain Hit by Its Worst Tragedy... Lee Kangin, Moreno and Real Madrid Join Soccer World in Mourning
- They Said, “Make It Your Home for Life” - Then Suddenly Kicked 200 Passengers Off... What Happened to the Around-the-World Cruise?
- "130 Rice Bowls Sold Out in a Day"... 'Unfiltered Face' Adds 8 Million Won to Night Market Sales: China's Bungeunwoo
Move-in is scheduled for October 2029 for Complex 1 and December 2029 for Complex 2.
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.