Canceled After 2011 Due to Low Profitability

25 Floors and 750 Households Planned

The Ministry of Land, Infrastructure and Transport announced on April 9 that Korea Land & Housing Corporation (LH) has been designated as the public developer for the street housing maintenance project in the Nan-gok A2 District of Gwanak, Seoul. Previously, the area had been designated for redevelopment in 2011, but the project was canceled due to profitability issues and has since experienced delays.


This marks the first time that a public institution will independently take charge of the entire process of a small-scale housing maintenance project. LH has worked to address the factors causing delays by expanding the project area and adopting designs that overcome the terrain, such as steep slopes, in order to improve profitability. LH plans to select a construction company within this year, obtain project implementation approval next year, and proceed with the necessary follow-up procedures, aiming to commence construction in 2028. The project will consist of up to 25 floors and accommodate 750 households.


Park Kwonpal, Chairman of the Residents' Representative Council, said, "Since LH is responsible for the entire process, I hope the long-delayed maintenance project will finally move forward in earnest."

Aerial perspective of Nangok A2 district in Gwanak, Seoul. Provided by the Ministry of Land, Infrastructure and Transport.

Aerial perspective of Nangok A2 district in Gwanak, Seoul. Provided by the Ministry of Land, Infrastructure and Transport.

View original image

The small-scale housing maintenance project is designed to renovate old, low-rise neighborhoods where large-scale redevelopment or reconstruction is difficult, by carrying out redevelopment on sites less than 10,000 square meters. While the simplified procedures can accelerate project timelines, many projects are delayed due to low profitability or complex ownership structures, as the expertise of the cooperatives involved is often insufficient.


To address these issues, the Ministry allows the project area to be expanded to a maximum of 40,000 square meters when public entities participate, and offers low-interest loans at rates between 1.9% and 2.2%. In February of this year, the Ministry improved the system by lowering the consent rate requirement for cooperative establishment by 5 percentage points compared to the previous standard, and by raising the acquisition price standard for rental housing from the standard construction cost to the basic construction cost.



Kim Youngguk, Head of Housing Supply Promotion at the Ministry of Land, Infrastructure and Transport, stated, "We will actively support institutional improvements to ensure that public-led projects can take the lead in supplying housing within urban areas." Park Hyeongeun, Head of the LH Metropolitan Area Maintenance Project Headquarters, added, "By strengthening the public sector's role, we aim to reduce the burden on residents and accelerate project timelines, creating a new model for supplying housing through urban maintenance projects."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing