· Unwavering Project Control Tower: Launch of the "GH-Style Fast Track"
· Move-in Schedule for 7,000 Units, Including Hanam Gyosan, to Be Advanced by One Year
· Speed Race: 1,000 Modular Homes Annually (5-Fold Increase), Cutting Construction Time by 30%
· Over 100,000 Public Housing Units: 70,000 for Construction, 30,000 for Rental
· Expansion of Gyeonggi-Style "Job-Housing-Leisure" Mixed-Use Opportunity Towns

Gyeonggi Housing and Urban Development Corporation (GH) is set to embark on "more and faster" housing supply, leveraging a robust financial capacity of 31 trillion won secured through recent institutional improvements, in support of the government's strong real estate market stabilization measures.


On April 2, GH held a press conference and announced the "GH Bridge 2030 Action Plan," which aims to connect the present and future of housing and cities in Gyeonggi Province.


This action plan was formulated under the judgment that the next two to three years will be a decisive period for the success or failure of government policies, such as normalization of the housing market. The plan seeks to enhance speed and effectiveness to strengthen public trust.


The core driving force is the elimination of structural limitations in securing financial resources. With the revision of the Ministry of the Interior and Safety’s corporate bond issuance approval system last month, GH will have access to more than 31 trillion won in funding capacity through 2030.


Based on this expanded financial foundation, GH has installed a company-wide control tower to ensure unwavering project execution, and has equipped itself with a powerful, field-centric organizational system where authority and responsibility are greatly delegated, thereby installing a new engine for progress.


Leveraging this secured momentum, GH will fully implement the "2030 GH-Style Housing Supply Fast Track."


By simultaneously carrying out preliminary processes such as compensation and removal of obstacles, and by utilizing neighboring infrastructure on a temporary priority basis, GH plans to accelerate administrative innovation and bring forward the move-in schedule for about 7,000 units in five priority districts, including Hanam Gyosan, by an average of over one year.


The housing supply volume will also be expanded, with more than 20,000 additional units to be supplied in areas such as Buk Suwon Technovalley and Hwaseong Jin'an, on top of the existing target of 50,000 units.


Furthermore, based on regional data and demographic analysis, GH will provide 30,000 units of demand-responsive public rental housing tailored to local needs.


Additionally, the number of modular housing units—which can shorten the construction period by 30%—will be increased from the current 862 units to about 1,000 units annually.


GH will also lead the qualitative evolution of living spaces and restore the housing mobility ladder for vulnerable groups such as youth and newlyweds.


From the "city" perspective, GH will move beyond simply creating bedroom communities and will spread the "Gyeonggi-Style Opportunity Town" model, which combines jobs, housing, and leisure. This will foster self-sustaining future cities that create high-income jobs in advanced industries.


Kim Yongjin, President of Gyeonggi Housing and Urban Corporation, is announcing the "GH Bridge 2030 Action Plan" on the 2nd. Provided by Gyeonggi Housing and Urban Corporation

Kim Yongjin, President of Gyeonggi Housing and Urban Corporation, is announcing the "GH Bridge 2030 Action Plan" on the 2nd. Provided by Gyeonggi Housing and Urban Corporation

View original image

GH plans to spread the successful DNA accumulated through the Pangyo Technovalley project to other projects it is involved in, such as Buk Suwon TV, Yongin Platform, and Anyang Indeokwon, making the Gyeonggi-Style Opportunity Town a standard for urban residential development in Korea.


To enable young people and newlyweds without homes to achieve their dream of homeownership without a heavy initial financial burden, GH will begin with the first share accumulation housing supply in Gwanggyo New Town this fall, and will expand the supply of such homes to about 1,000 units annually until 2030.


In addition, GH will proactively respond to the climate crisis from the urban planning stage by aiming for the 2050 Zero Energy City, going beyond the legal minimum requirements and even beyond public sector-led Zero Energy Building (ZEB) initiatives.


GH will shift away from the uniform, supply-driven development model led by the government during rapid growth, and will transition to a business structure and approach that actively responds to local demand. Through the "Project 31 Partners" initiative, GH will gather feedback on urban, housing, industrial complex, reconstruction, and redevelopment issues from the 31 cities and counties in Gyeonggi Province, and reflect these in future new projects.



Kim Yongjin, President of GH, stated, "With the government's groundbreaking institutional support, we now have solid ammunition of 31 trillion won in place, and we are fully prepared to accelerate key projects such as the third-phase new towns. GH will serve as a powerful policy implementation engine that leads the housing stability of the underprivileged and advances government policy."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing