Reborn as a Vast Urban Green Space by 2027
KRW 75.4 Billion Invested for a 100,000-Square-Meter Park
A Long-Unimplemented Project Finally Begins
Drifting Since Urban Planning Designation in 1971
Full-Scale Efforts to Resolve Long-Unimplemented Parks

The long-awaited "Todang Neighborhood Park," a project that residents of Deogyang-gu, Goyang Special City in Gyeonggi Province have hoped for over the past 55 years, has finally broken ground. Designated as an urban planning facility in 1971, the site, which had remained stagnant for more than half a century, will be reborn as a vast green heart for local citizens.

Lee Donghwan, mayor of Goyang Special City, is holding a groundbreaking ceremony for Todang Neighborhood Park on the 27th at 656-6 Haengsin-dong, attended by approximately 200 local residents. Provided by Goyang City

Lee Donghwan, mayor of Goyang Special City, is holding a groundbreaking ceremony for Todang Neighborhood Park on the 27th at 656-6 Haengsin-dong, attended by approximately 200 local residents. Provided by Goyang City

View original image

Goyang Special City announced on March 27 that it held a groundbreaking ceremony for Todang Neighborhood Park at 656-6 Haengsin-dong, attended by Donghwan Lee, Mayor of Goyang Special City, and around 200 local residents.


The city plans to invest a total project cost of KRW 75.4 billion, including approximately KRW 63.3 billion for land compensation and KRW 12.1 billion for construction, to develop a park covering about 105,917 square meters across the areas of Hangju-dong and Haengsin 1 and 2-dong by December 2027. Once completed, the park is expected to serve as a large-scale green space for more than 60,000 nearby residents, as well as about 2,500 new households that will move in following the Neunggok redevelopment project.


Mayor Donghwan Lee stated, "This park, which remained unimplemented for a long time, can now finally return to the citizens," adding, "With the ongoing urban changes like the Neunggok redevelopment, we expect this park to become a representative neighborhood green space that more citizens can enjoy."

Goyang Special City held a groundbreaking ceremony for Todang Neighborhood Park on the 27th at 656-6 Haengsin-dong, attended by Moving Hwan Goyang Special City Mayor and about 200 local residents. Provided by Goyang City

Goyang Special City held a groundbreaking ceremony for Todang Neighborhood Park on the 27th at 656-6 Haengsin-dong, attended by Moving Hwan Goyang Special City Mayor and about 200 local residents. Provided by Goyang City

View original image

A Park Where Nature and People Coexist... "Todang Forest, Listen to the Stories of the Woods"

The city plans to secure about 73% of the total area of Todang Neighborhood Park as green space and create a natural-style relaxation area within the city. The park is designed to minimize environmental damage by preserving the existing forest as much as possible and placing facilities primarily in previously damaged areas such as cultivated land and old residential sites.


Todang Neighborhood Park will be developed under the concept of "Todang Forest, Listen to the Stories of the Woods," creating a space where nature, people, and local stories blend together. The park will be organized around three themes: Healing Forest, Forest for All, and Story Forest.


The Healing Forest will be the central space, making use of the existing terrain and hiking trails, and will provide an environment where people can walk and relax in everyday life through barrier-free deck paths, circular walking trails, and loess barefoot trails.


The Forest for All will be an open space that embraces all generations and social groups. Near Neunggok Intersection, an open forest will be created using the existing terrain, featuring flower beds and rock gardens, forming a gateway landscape from Jayu-ro to Haengsin-ro.


Additionally, at the intersection of Haengsin-ro and Sowon-ro, the Eoullim Madang Forest will be created, which will include a forest playground, a nature observation center, a plaza, and a café. Near Muwon Middle School, the Healthy Madang Forest will feature a senior park, meditation deck, and butterfly garden, creating a space that can be enjoyed by everyone from children to seniors.


The Story Forest will be a space that reflects the region's history and culture. Centered around the tomb of General Ryu Hyeong (Gyeonggi Province Cultural Heritage No. 50) and the Jinju Ryu Clan Cemetery (a local cultural heritage site), a story wall and story rest area will be created. Lawns and a shady plaza will also be included, providing a place where people can immerse themselves in both nature and local history and culture.

Goyang City, Todang Neighborhood Park Groundbreaking - Panorama of the Todang Neighborhood Park Site. Provided by Goyang City

Goyang City, Todang Neighborhood Park Groundbreaking - Panorama of the Todang Neighborhood Park Site. Provided by Goyang City

View original image

A 55-Year-Long Aspiration for Residents... Full-Scale Resolution of Long-Unimplemented Parks

Todang Neighborhood Park had been a representative long-unimplemented park project, with its development delayed for decades since being designated as an urban planning facility in 1971. In 2011, only a portion of a badminton court in Haengsin was built, and due to land compensation and financial challenges, the project remained stalled, becoming a longstanding aspiration for local residents.


The project, which had drifted for more than half a century, began to move forward in June 2020 when the city announced the park implementation plan, excluding Todang Neighborhood Park from the sunset clause for long-unimplemented urban parks. The city purchased the park site, which was at risk of disappearing due to the sunset clause, and completed all compensation procedures by May 2024 through a phased approach.


Subsequently, the city held resident briefings and consultations to reflect community input. Although there were differences of opinion between residents and Deokyangjeong (the Goyang City Archery Association) regarding the installation of an archery range, the city reviewed alternative sites and established a tripartite consultative body to mediate and reach a consensus.


For speedy progress, demolition of obstacles on the site began in July last year, and by the end of last year, the plans for park development and implementation had been finalized, allowing full-scale construction to officially begin in March this year.



Going forward, the city plans to continue resolving long-unimplemented park projects in phases, aiming to improve the quality of life for citizens and expand green infrastructure for future generations.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing