Comprehensive Inspection and Maintenance of Agricultural Wells and Water Pumping Equipment

The government is taking preemptive measures to secure agricultural water supplies in preparation for spring droughts. Authorities will fill reservoirs with water and conduct comprehensive inspections of water supply facilities and equipment to ensure immediate support in the event of a drought.


The Ministry of Agriculture, Food and Rural Affairs announced on the 25th that, ahead of the full-scale farming season, it will review the progress of measures to secure agricultural water in areas with low precipitation and drought concerns, as well as check the management status of wells and water pumping equipment.


Reservoirs to Be Filled in Preparation for Spring Drought... Agriculture Ministry Launches Preemptive Water Security Measures View original image

As of March 23, the average storage rate of agricultural reservoirs nationwide stands at 81.7%, slightly higher than the normal average of 78.6%. However, the cumulative average precipitation from January 1 to March 23 this year is only 59.3 mm, which is 55% of the usual 107.0 mm, raising concerns that continued low rainfall in the spring could negatively impact crop growth.


In response, the Ministry of Agriculture, Food and Rural Affairs has decided to draw river water into 115 reservoirs with low storage rates out of the 3,428 reservoirs managed by Korea Rural Community Corporation, in order to fill them. The ministry also plans to proactively secure water by providing direct supply through irrigation channels and similar efforts. Initially, the ministry implemented water security measures for drought preparedness in 62 reservoirs starting in November last year, but in light of insufficient winter precipitation, it has expanded the operations to 115 sites to ensure a more thorough response to drought before this year’s farming season begins.


To ensure immediate operation if needed, a comprehensive inspection and maintenance will be conducted on wells, water pumps, and water hoses. Local governments will inspect 41,000 public wells nationwide, 26,000 water pumps, and 3,300 km of water hoses, completing any necessary repairs before the farming season begins. In accordance with relevant laws, inspections of facility management, such as post-management and water quality testing, will also be carried out.


Additionally, following a survey on the current status of rural water shortages nationwide, the ministry will review the progress of the drought response water development project, which supports the installation of water supply facilities such as wells, pumping stations, and reservoirs in areas with water shortages. For regions where projects can be completed before the farming season, efforts will be made to finish them promptly to ensure a stable supply of agricultural water this year.



Lee Jaecheon, Director of Agricultural Infrastructure at the Ministry of Agriculture, Food and Rural Affairs, stated, "We will conduct preemptive inspections of drought-prone areas before the farming season and implement agricultural water security measures without delays to do our utmost to minimize drought damage to crops this year."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing