Gyeonggi Province Unveils 4th Road Construction Plan
Power Grid for Yongin Semiconductor Cluster to Be Built Alongside New Roads
Includes Projects for "Tourism-Type Roads" and More

Gyeonggi Province will invest a total of 1.6133 trillion won by 2030 to launch 25 new local road construction projects across 15 cities and counties.

Gyeonggi Provincial Government Building. Provided by Gyeonggi Province

Gyeonggi Provincial Government Building. Provided by Gyeonggi Province

View original image

On March 23, Gyeonggi Province announced the details of its "4th Gyeonggi Province Road Construction Plan (2026–2030)" in the official provincial gazette.


The Gyeonggi Province Road Construction Plan (2026–2030) is a five-year statutory plan outlining the province’s road construction projects through 2030. Over the past two years, the province conducted feasibility studies and comprehensive evaluations on 68 projects proposed by cities and counties, ultimately selecting 25 routes (totaling 85.52 km) based on urgency, economic viability, and other factors.


By region, 18 projects are in the southern part of Gyeonggi (Gwangju [2], Gimpo [1], Anseong [3], Yangpyeong [1], Yeoju [1], Yongin [4], Icheon [3], Pyeongtaek [1], Hwaseong [2]), while 7 are in the north (Gapyeong [1], Namyangju [1], Yangju [2], Yeoncheon [1], Paju [1], Pocheon [1]).


The province has selected 11 key projects in four priority areas among the 25 routes, taking into account factors such as project feasibility, anticipated benefits, and road functions.


First, for projects with strong business potential and secured implementation, the province will expand the Local Road No. 310 section from Munhak to Sinri in Hwaseong (1.67 km), and the section from Yeokbuk to Seori in Cheoin-gu, Yongin (3.06 km).


For "tourism-type roads" aimed at revitalizing the local economy, new routes will be established for the Pocheon Giji to Gilmyeong section (2.89 km) and the Paju Yeongjang to Yeongjang section (2.85 km). These two routes are expected to boost tourism in northern Gyeonggi and improve access to medical and administrative services.


To address traffic congestion, the plan includes the expansion of the Pyeongtaek Paengseong Bridge to Oseong Sinri section (3.77 km) and the construction of new sections from Yongin Deokseong to Muk-ri (2.26 km) and Gimpo Gojung to Gwijeon (1.68 km).


Gyeonggi Province’s "joint road and power grid construction" initiative, the first of its kind in the country, designated four routes as key projects: the Icheon Geumdang to Sinpil section (3.19 km) and Icheon Susan to Haengjuk section (3.82 km) on Local Road No. 318, as well as Yongin Dokseong to Baekbong (5.53 km) and Yongin Baekam to Seolseong (9.76 km). In collaboration with Korea Electric Power Corporation, the province plans to install power grids during the road construction phase to quickly supply electricity to the semiconductor industrial complexes, while simultaneously minimizing inconvenience to residents and preventing budget waste.



Kim Daesoon, the Second Vice Governor of Gyeonggi Province, stated, "We will create roads that offer opportunities in residents’ daily lives, not just serve as simple means of transportation," adding, "We will focus our administrative efforts to ensure the smooth implementation of the 4th Gyeonggi Province Road Construction Plan."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing