Integrated Development of A4 and A5 Zones
Significant Improvement in Project Feasibility with Public-Sector Participation

Goyang Special City in Gyeonggi Province (Mayor Lee Donghwan) announced on the 19th that on the 13th it successfully held a residents' briefing session at the Ilsan General Social Welfare Center on the "Ilsan-dong Small-Scale Housing Maintenance Management Plan (hereinafter referred to as Mirae Town) Establishment Public Notice," with about 170 residents and other land and property owners in attendance.

Goyang Special City (Mayor Lee Donghwan) held a residents' briefing on the 13th following the public notice establishing the management plan for small-scale housing maintenance in Ilsandong. Provided by Goyang City

Goyang Special City (Mayor Lee Donghwan) held a residents' briefing on the 13th following the public notice establishing the management plan for small-scale housing maintenance in Ilsandong. Provided by Goyang City

View original image

This briefing was a follow-up measure to the management plan that was designated and publicly notified in December last year. It was organized to bundle individual projects into five zones, from A1 to A5, in order to induce systematic development, and to inform residents of the various special provisions granted when the public sector participates in the project.


First, EUM Engineering Co., Ltd., which participated in the establishment of the management plan, explained the background and detailed contents of the plan. In particular, it emphasized that, after the cancellation of the previous redevelopment promotion district, areas that had been classified as Type 1 General Residential Zones, where apartment construction had been impossible, were upgraded to Type 2 General Residential Zones, and that by completing plans for infrastructure such as roads and parks, the legal and practical foundation had been laid for residents to actually move forward with the project.


Korea Real Estate Board clearly explained the step-by-step procedures of the project along with the "base date for calculating the value of existing assets," which is the issue of greatest interest to residents. A representative of the Korea Real Estate Board stated, "The base date for assessing the value of my house and land is the date on which the architectural review results are notified," and went on to explain in detail that this point in time will become an important turning point in determining residents' future cost-sharing obligations, thereby resolving their questions.


Next, Goyang Urban Management Corporation announced the special provisions granted when the public sector participates in the project, including: expansion of project area (up to 40,000 square meters), reduction of the ratio of rental housing, and support for administrative services and professional project management. In particular, it presented objective business feasibility analysis figures for public joint implementation compared to private-sector-only implementation, based on simulation results that assumed construction costs of 7.5 million won per pyeong and a pre-sale price of 22 million won per pyeong.


In particular, for the A4 and A5 zones in Ilsan-dong, it was found that the conditions for integrated development can be met when the public sector participates, making it possible to achieve "economies of scale." The corporation drew attention by releasing concrete data showing that, if zone integration leads to an increase in the number of households and minimization of building regulations, the business feasibility improves significantly.



An official from Goyang City stated, "The purpose of this briefing was to provide accurate information on the concept of Mirae Town, the procedures for the maintenance project, and the advantages of public-sector participation," adding, "We will continue to do our best to ensure that Ilsan-dong Mirae Town becomes a successful model for the redevelopment of Goyang City's old downtown through transparent information disclosure and systematic administrative support."


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing