Reinforcing Aging Sea Dikes to Cope with Climate Change

Goheung County in South Jeolla Province announced that three new districts have been finally selected for the 2026 local-managed sea dike repair and renovation project, which is being promoted to prevent farmland flooding and strengthen resilience to natural disasters.


The sea dike repair and renovation project is designed to reinforce the embankments of sea dikes whose functions have deteriorated due to aging, and to repair and renovate drainage floodgates and auxiliary facilities. Through this project, the county aims to prevent the collapse and damage of facilities during natural disasters such as floods and typhoons, and to protect farmland from seawater intrusion.

Goheung County has finally selected the Songgang No. 1 and No. 2 coastal embankments in Daeseo-myeon and the Bongnam coastal embankment in Dongil-myeon for the 2026 local-managed coastal embankment rehabilitation project, aimed at preventing farmland flooding and strengthening natural disaster response. Photo shows the Bongnam coastal embankment in Dongil-myeon. Photo provided by Goheung County.

Goheung County has finally selected the Songgang No. 1 and No. 2 coastal embankments in Daeseo-myeon and the Bongnam coastal embankment in Dongil-myeon for the 2026 local-managed coastal embankment rehabilitation project, aimed at preventing farmland flooding and strengthening natural disaster response. Photo shows the Bongnam coastal embankment in Dongil-myeon. Photo provided by Goheung County.

View original image

The three districts selected this time are the Daeseo-myeon Songgang 1 and 2 sea dikes and the Dongil-myeon Bongnam sea dike. These facilities were constructed more than 50 years ago and have been in urgent need of maintenance, with serious problems such as displaced riprap and leakage, and a D-grade rating in safety inspections. In particular, there has been growing concern among residents about salt damage to farmland caused by seawater intrusion during typhoons or heavy rains.


To resolve the problem of deteriorating functions of aging sea dikes, Goheung County has continuously appealed to the Ministry of Agriculture, Food and Rural Affairs for the necessity and urgency of the project. As a result, the county has secured a total project budget of 7.4 billion won, including national funding.


An official from the county’s Disaster and Safety Division said, "With the selection of these new districts, we will be able to fundamentally eliminate risk factors in areas that are chronically vulnerable to disasters," adding, "Once the project is completed, it will not only help prevent flood damage but also greatly contribute to increasing local farmers' income and creating a stable farming environment."



The county plans to launch detailed design services for the newly designated districts in the first half of this year and, during the design process, will actively gather opinions from local residents to establish a practical and effective implementation plan.


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing