Chuncheon City Launches "Five Key Architectural Regulation Reforms"... To Cut Permit Processing Time by 30%
Chuncheon City to Significantly Ease Landscape Reviews for Small-Scale Buildings
Five Key Improvement Measures, Including Eased Landscape Reviews for Small Buildings and Shortened Permit Processing
Rationalizing Regulations Based on Discussions at the Architects' Meeting in November Last Year
Chuncheon City in Gangwon Province (Mayor Yuk Donghan) is moving to overhaul its systems to rationally improve regulations in the architectural sector, strengthen the competitiveness of the construction industry, and reduce inconveniences in citizens' daily lives.
Yuk Donghan, mayor of Chuncheon, at a meeting with local architects in November last year. Provided by Chuncheon City
View original imageOn the 5th, Chuncheon City announced "Five Key Measures to Improve Architectural Administration." Review of these measures began based on on-site opinions regarding the improvement of architectural regulations and administrative efficiency, which were raised at a meeting with local architects in November last year. The city then proceeded to refine the system through internal review and consultations among departments.
As a result, the city has come up with the following measures: simplifying landscape review for small-scale buildings; shortening the processing period for building permits and approvals; adjusting to realistic levels the fees for on-site inspections delegated during the building use approval process; placing separate orders for mechanical design services for public buildings; and adjusting to realistic levels the grading standards for assigning full-time supervisors to public buildings.
The city will ease the landscape review standards for small-scale buildings that do not significantly affect the cityscape. In key landscape management zones, the threshold for review will be raised from buildings of 3 stories or more to 4 stories or more. In general areas, the current standard of 4 stories or more or a total floor area of 2,000 square meters will be relaxed so that only buildings of 6 stories or more or with a total floor area of at least 3,000 square meters will be subject to review.
Public buildings designed through design competitions and factories located in industrial complexes or quasi-industrial complexes will be exempted from landscape review. Through this, the city plans to concentrate its review capacity on buildings that involve key issues such as shaping the urban skyline and harmonizing with the surrounding landscape. These measures will be implemented through amendments to the "Chuncheon City Landscape Ordinance."
The processing period for building permits and approvals will also be significantly reduced. Aiming to shorten the statutory processing period by 30%, the city will use a pre-consultation system before application to check in advance whether permits and approvals are feasible and what supplementary items are needed, and will improve the way it coordinates with related departments. By using a standard checklist, the city will reduce unnecessary requests for supplementary documentation, and it plans to notify applicants of any supplementary requirements within five days of filing in order to minimize delays in handling civil petitions. In addition, it will strengthen on-site responsiveness and expertise by providing regular training for staff in charge and institutionalizing meetings with architects.
The city will also review ways to rationally adjust the fees for on-site inspections delegated during the building use approval process. In design service contracts for public buildings, the mechanical engineering component will be tendered separately to expand bidding opportunities for local small and medium-sized design firms, and the criteria for assigning full-time supervisors will be adjusted to reflect the actual scale and complexity of the building.
Through these five key architectural policies, Chuncheon City expects to enhance administrative efficiency and generate a combined synergy effect of revitalizing the construction industry and improving citizen convenience. In connection with this, on the 5th, Mayor Yuk Donghan and related Chuncheon City officials met with the incoming and outgoing leadership of the Chuncheon Branch of the Korean Institute of Architects in the reception room at City Hall to explain the improvement measures.
Mayor Yuk Donghan said, "I expect these policies to work organically and lead to the revitalization of the local construction industry and improved convenience for citizens," adding, "We will boldly improve unreasonable on-site regulations and continue to pursue innovation in architectural administration that citizens can truly feel by reflecting the opinions of citizens and experts."
He went on to say, "It is highly meaningful that we have created a win-win model in this way together with the Chuncheon Branch of the Korean Institute of Architects," and added, "Since it will take some time for the policies to become firmly established in the field, I hope you will understand that process as a stage of development."
Song Seongguk, outgoing head of the Chuncheon Branch of the Korean Institute of Architects, said, "I appreciate that issues such as shortening the permit and approval process have been quantitatively analyzed and that improvement measures have been prepared," and added, "The fact that the discussions at the meeting have actually led to policy changes in itself represents a meaningful shift."
Hot Picks Today
"Two Spend 500,000 Won in a Flash, Yet Wait Two Hours?" ... 'Dreamland' Shunned by Kids and Foreign Tourists
- The Era of Getting 200 Million Won After 30 Years Is Over... A Japanese Bank's "Perpetual Department Head" Who Just Clocked In Cries Out
- Spain Hit by Its Worst Tragedy... Lee Kangin, Moreno and Real Madrid Join Soccer World in Mourning
- They Said, “Make It Your Home for Life” - Then Suddenly Kicked 200 Passengers Off... What Happened to the Around-the-World Cruise?
- "130 Rice Bowls Sold Out in a Day"... 'Unfiltered Face' Adds 8 Million Won to Night Market Sales: China's Bungeunwoo
Hong Seokjin, the new head of the Chuncheon Branch of the Korean Institute of Architects, also said, "I believe this set of improvement measures has been designed in a way that can substantially reduce the unreasonable procedures that have been felt in the field of architecture," adding, "Local architects will actively cooperate so that these policies can take root stably in the field."
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.