It Was Next Week... NASA Delays Artemis II Launch to March Due to Fuel Leaks
Liquid Hydrogen Leaks During Rehearsal
Launch Likely Between the 6th and 11th of Next Month
The National Aeronautics and Space Administration (NASA) has postponed the launch of Artemis II, a mission to send astronauts into lunar orbit, by one month. The delay was caused by multiple fuel leaks that occurred during rehearsal.
On the 3rd (local time), NASA announced, "We are targeting March as a potential launch period and will conduct a full review of the test data to resolve the issues."
The launch schedule was pushed back after fuel leaks were detected during the Wet Dress Rehearsal. This is a simulated test in which fuel is loaded into the rocket and the team practices down to the countdown phase, allowing issues that typically occur just before launch to be identified in advance.
If the rehearsal had been successful, NASA would have been able to launch the rocket on the 8th of this month as originally planned. However, due to the failure, the launch has been postponed to next month. The Artemis launch windows are set based on Earth's rotation and the Moon's orbit around Earth. The available launch window this month runs from the 6th to the 11th, and if NASA cannot launch during this period, the next available window will be from the 6th to the 11th of next month. NASA has not specified an exact target launch date.
The latest rehearsal was conducted over about 49 hours starting on the 31st of last month. Multiple fuel leaks are reported to have occurred during the process. According to NASA, fuel leaked even during the fueling phase, and it took several hours to address the problem. Later, when about five minutes remained in the countdown, the liquid hydrogen leak rate surged, triggering the ground launch control system to detect the anomaly and halt the launch again. NASA also reported that an issue previously flagged as a concern — intermittent loss of audio communication channels among ground teams — reoccurred.
With the launch postponed, the astronauts are being released from the quarantine that had been in place since the 21st of last month. They are expected to re-enter quarantine roughly two weeks before the next target launch window. NASA stated, "Crew safety is our top priority," adding, "We will ensure that the astronauts can return safely after completing their mission."
Hot Picks Today
"Two Spend 500,000 Won in a Flash, Yet Wait Two Hours?" ... 'Dreamland' Shunned by Kids and Foreign Tourists
- The Era of Getting 200 Million Won After 30 Years Is Over... A Japanese Bank's "Perpetual Department Head" Who Just Clocked In Cries Out
- Spain Hit by Its Worst Tragedy... Lee Kangin, Moreno and Real Madrid Join Soccer World in Mourning
- They Said, “Make It Your Home for Life” - Then Suddenly Kicked 200 Passengers Off... What Happened to the Around-the-World Cruise?
- "130 Rice Bowls Sold Out in a Day"... 'Unfiltered Face' Adds 8 Million Won to Night Market Sales: China's Bungeunwoo
Artemis II is a crewed mission in which four astronauts will orbit the Moon and then return to Earth. It is designed to verify the performance and safety of the rocket and spacecraft ahead of Artemis III, which aims to land astronauts on the lunar surface. If the program proceeds as planned, astronauts are expected to attempt a lunar landing mission next year or in 2028.
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.