Jung-gu, Seoul Begins Construction of Sindang Station Public Parking Tower in "Hipdang-dong"... Secures 123 Spaces
Parking Capacity Increased Fivefold from 26 Spaces
Completion Scheduled for December
Jung-gu District Office in Seoul (Mayor Kim Gilsung) announced on January 28 that construction of a public parking tower near Sindang Station began on January 27 to address the parking shortage in the area. This facility is a public mechanical parking tower and is scheduled for completion in December this year.
Kim Gilsung, Mayor of Jung-gu, is delivering a commemorative speech at the groundbreaking ceremony of Sindang Station Parking Tower. Provided by Jung-gu.
View original imageThe parking tower will be built on the site of the existing Sindang Public Parking Lot (1,011 square meters), with one basement floor and six above-ground floors, a total floor area of 2,621.4 square meters, and a height of 42.45 meters. Parking spaces will be provided on the third to sixth floors above ground, totaling 123 spaces-about five times more than the previous 26 spaces.
Until now, the Sindang Station public parking lot lacked sufficient space to meet the parking demand from nearby residential areas, commercial districts, the recently popular "Hipdang-dong," and the Shin Jungang Market area.
The first basement level of the parking tower will connect directly to the underground Sindang Station, which serves subway lines 2 and 6. By using the "Sindang Station-Sindang Underground Shopping Center Connecting Underground Passage," which opened on December 3, people can safely access Shin Jungang Market and Hipdang-dong on the opposite side without crossing the street above ground.
An open park will be created outside the parking tower to provide a relaxation area, and the facility will also serve as a pedestrian passage connecting Dasan-ro and Toegye-ro, which are currently blocked by fences and buildings. The first floor will feature an open public restroom, while the second floor will house the second Jung-gu Tuntun Center and a community facility for residents. Solar panels will be installed on the rooftop.
The facility will introduce a state-of-the-art mechanical system to reduce vehicle exit times to 60-90 seconds and will operate with staff on duty 24 hours a day. Waiting parking spaces will be provided near the entrance to minimize congestion on surrounding roads.
About 100 people, including Mayor Kim Gilsung, local residents, and related officials, attended the groundbreaking ceremony held on January 27.
Hot Picks Today
"Two Spend 500,000 Won in a Flash, Yet Wait Two Hours?" ... 'Dreamland' Shunned by Kids and Foreign Tourists
- The Era of Getting 200 Million Won After 30 Years Is Over... A Japanese Bank's "Perpetual Department Head" Who Just Clocked In Cries Out
- Spain Hit by Its Worst Tragedy... Lee Kangin, Moreno and Real Madrid Join Soccer World in Mourning
- They Said, “Make It Your Home for Life” - Then Suddenly Kicked 200 Passengers Off... What Happened to the Around-the-World Cruise?
- "130 Rice Bowls Sold Out in a Day"... 'Unfiltered Face' Adds 8 Million Won to Night Market Sales: China's Bungeunwoo
Mayor Kim Gilsung stated, "The Sindang Station Parking Tower is a new attempt to efficiently utilize limited urban land and solve parking issues. In addition to expanding parking spaces, we will organically connect the subway, traditional markets, and local commercial districts, creating a landmark where both residents and visitors can experience meaningful change."
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.