Seoul Energy Corporation Achieves First Profit in 9 Years Since Founding, Reaches 7 Billion Won
Profitability Achieved One Year Ahead of Target...
Performance Improved by Over 30 Billion Won from Previous Year
Securing Momentum for Projects Such as Southwest District Energy Facility Construction
Seoul Energy Corporation (President Hwang Boyeon) recorded an annual surplus of 7 billion won for the first time since its establishment in 2016. This marks an improvement of over 30 billion won in performance compared to last year's deficit of 23.3 billion won in 2024, achieving the turnaround to profitability one year ahead of the original target set for 2026.
Seoul Energy Corporation headquarters exterior. Provided by Seoul Energy Corporation.
View original imageOn January 26, the corporation announced that it had dispelled concerns over its viability caused by chronic deficits and secured momentum to push forward with the construction of the 700 billion won Southwest District Energy Facility project.
The corporation’s net income has steadily reduced its deficit, from a 125.4 billion won loss in 2022, to 64.9 billion won in 2023, and 23.3 billion won in 2024. The significance of last year’s turnaround lies in the fact that it resulted from structural reforms, rather than being a one-off event.
The key factor behind the surplus was a complete overhaul of the operation method for the combined heat and power (CHP) facilities. The corporation introduced a system that separates the heat supply networks between Mokdong, where summer cooling demand is low, and Magok, where it is high. In addition, it implemented ‘optimal differential pressure operation,’ which minimizes the pressure in transmission pipes in real time according to heat demand, thereby improving economic efficiency.
As a result, electricity sales revenue increased by 9.4 billion won, from 15.5 billion won last year to 24.9 billion won this year. Summer electricity production rose by 461% year-on-year, while production during the shoulder season (October to November) increased by 566%.
Strengthened safety management also contributed to improved profitability. While there were six emergency repairs and leakage incidents involving heat transmission pipes in 2024, not a single incident occurred this year, significantly reducing emergency repair costs and operational losses.
Building on this turnaround, the corporation will fully launch the second phase construction of the Southwest District Energy Facility in the Magok Urban Development Zone, Gangseo-gu, Seoul, with a capacity of 285MW for electricity and 258Gcal/h for heat. With a total project cost of 700 billion won, the facility aims to supply district heating to approximately 74,000 households and 428 buildings, with completion targeted for July 2031.
On December 31 last year, the corporation signed a basic agreement with Korea South-East Power to establish a special purpose company (SPC), with each party contributing 90 billion won for a total joint investment of 180 billion won. The plan is to complete the SPC establishment by the first half of this year and break ground in December.
Hot Picks Today
"Two Spend 500,000 Won in a Flash, Yet Wait Two Hours?" ... 'Dreamland' Shunned by Kids and Foreign Tourists
- The Era of Getting 200 Million Won After 30 Years Is Over... A Japanese Bank's "Perpetual Department Head" Who Just Clocked In Cries Out
- Spain Hit by Its Worst Tragedy... Lee Kangin, Moreno and Real Madrid Join Soccer World in Mourning
- They Said, “Make It Your Home for Life” - Then Suddenly Kicked 200 Passengers Off... What Happened to the Around-the-World Cruise?
- "130 Rice Bowls Sold Out in a Day"... 'Unfiltered Face' Adds 8 Million Won to Night Market Sales: China's Bungeunwoo
Hwang Boyeon, President of Seoul Energy Corporation, stated, "This surplus is more than just a financial achievement; it is the result of the efforts of our executives and employees who have driven change on the ground, as well as structural management improvements. We will continue to faithfully fulfill our role as a public enterprise responsible for supporting citizens’ lives with stable energy infrastructure and leading the future energy transition, based on ongoing stable surplus management."
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.