Gimpo City Secures Final Approval for Gimpo Gold Line Hakun Extension in Gyeonggi Province Urban Rail Network Plan
Gimpo City: Just 9 Minutes from Yangchon Station to Geomdan-Oryu Station Upon Opening
Significant Improvement in Metropolitan Transportation Convenience for the Western Region... Connection to Geomdan-Oryu Station by 2035
Mayor Kim Byungsoo: "Expecting to Boost the Local Economy by Attracting Companies and Creating Jobs"
Gimpo City, Gyeonggi Province (Mayor Kim Byungsoo), announced on December 12 that the "Gimpo Gold Line Hakun Extension" project has been included in the Second Gyeonggi Province Urban Rail Network Construction Plan (2026-2035). On the same day, the National Transportation Committee (under the Ministry of Land, Infrastructure and Transport) approved the Gyeonggi Province Urban Rail Network Construction Plan, which includes the Gimpo Gold Line Hakun Extension.
Kim Byungsoo, Mayor of Gimpo City, met with Kim Dongyeon, Governor of Gyeonggi Province, on the 3rd of last month to actively discuss Gimpo transportation issues, including the Gimpo Gold Line. Provided by Gimpo City
View original imageThe "Gimpo Gold Line Hakun Extension" project will connect the existing Yangchon Station to Geomdan-Oryu Station on Incheon Metro Line 2, spanning a total length of 7.04 kilometers with a project cost of 739.5 billion won. Once the project is completed, travel time between Yangchon Station and Geomdan-Oryu Station will be reduced to approximately nine minutes, significantly improving metropolitan transportation convenience in the western region of Gimpo.
Until now, industrial complexes in the vicinity, including Gimpo Gold Valley, have suffered from low public transportation accessibility, making workforce recruitment and industrial complex revitalization difficult. In particular, after the free commuter bus for Gimpo Industrial Complex workers (from Gurae Station to the industrial complex) ceased operations at the end of 2021, commuting inconveniences for the Yangchon and Hakun industrial complexes worsened. To address these issues, Gimpo City designated the Gold Line Hakun Extension as a key transportation policy initiative and has been actively pursuing it.
Since taking office, Mayor Kim Byungsoo has continuously requested the extension of the line through meetings with the Governor of Gyeonggi Province. In accordance with the "Urban Rail Network Construction Plan and Guidelines for Establishing Basic Plans for Each Line," Gimpo City reviewed and submitted routes to Gyeonggi Province that met either an economic feasibility (B/C) of 0.7 or higher, or a comprehensive evaluation (AHP) of 0.5 or higher. After multiple consultations with Gyeonggi Province, the Ministry of Land, Infrastructure and Transport, and other relevant agencies, the city succeeded in having the route included in the plan by passing reviews by both the Urban Transportation Policy Working Committee and the National Transportation Committee.
The Urban Rail Network Construction Plan is a legally mandated plan for the construction and operation of urban railways within metropolitan transportation areas. Moving forward, a preliminary feasibility study and a main feasibility study will be conducted before establishing the basic plan.
Mayor Kim Byungsoo stated, "This project is a core initiative to establish a mass transit system in response to the development of industrial complexes and the increase in commuting population in the western region." He added, "With this extension, the average travel time for bus and car users will be reduced from 30 minutes to nine minutes, and transportation costs will also decrease, providing a significant boost to attracting companies, creating jobs, and revitalizing the local economy." He further emphasized, "In line with the 2035 population plan of 735,000, we will strengthen transportation welfare and gradually expand the areas benefiting from railway transportation."
Hot Picks Today
"Two Spend 500,000 Won in a Flash, Yet Wait Two Hours?" ... 'Dreamland' Shunned by Kids and Foreign Tourists
- The Era of Getting 200 Million Won After 30 Years Is Over... A Japanese Bank's "Perpetual Department Head" Who Just Clocked In Cries Out
- Spain Hit by Its Worst Tragedy... Lee Kangin, Moreno and Real Madrid Join Soccer World in Mourning
- They Said, “Make It Your Home for Life” - Then Suddenly Kicked 200 Passengers Off... What Happened to the Around-the-World Cruise?
- "130 Rice Bowls Sold Out in a Day"... 'Unfiltered Face' Adds 8 Million Won to Night Market Sales: China's Bungeunwoo
Gimpo City plans to secure a budget in the second half of 2026 to conduct a preliminary feasibility study, with the goal of applying for the main feasibility study in 2027.
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.