Up to 35-Story Office and Mixed-Use Complex to Be Built Near Prima Hotel in Cheongdam-dong
Cheongdam-dong 52 Station Area Revitalization Project Passes Seoul City Review
Office, Neighborhood Living, and Cultural Facilities to Be Built
Multipurpose Hall to Be Open to the Public
A mixed-use complex with a maximum height of 35 stories will be built along Dosan-daero, adjacent to the Prima Hotel site in Cheongdam-dong.
Location map of the district unit planning area for the Gangnam-gu Cheongdam-dong 52 station area revitalization project. Provided by the Seoul Metropolitan Government
View original imageThe Seoul Metropolitan Government announced on December 11 that the 20th Urban and Architecture Joint Committee, held the previous day, had conditionally approved the designation and planning decision (draft) for the district unit planning area for the Gangnam-gu Cheongdam-dong 52 Station Area Revitalization Project.
The project site is located in a commercial area along Dosan-daero within the Gangnam Central International Business District. By pursuing a mixed-use development that includes prime-grade office facilities, the project is expected to help alleviate the shortage of office space supply.
The mixed-use complex will consist of eight underground floors and 35 above-ground floors, with a total floor area of approximately 64,460 square meters. The development will include office facilities, neighborhood living facilities, as well as cultural and assembly spaces. A multipurpose hall, which will be used as a conference hall, exhibition space, and small-scale performance venue, will be open to the public.
Aerial view of the district unit plan area for the revitalization project of the station area at 52 Cheongdam-dong, Gangnam-gu. Provided by Seoul City
View original imageAlong the section facing the main road, Dosan-daero (50 meters wide), a public open space (451.9 square meters) and an outdoor open area (280 square meters) will be created to provide an open urban rest area. A 3-meter-wide pedestrian zone will be established to improve pedestrian connectivity with Dosan-daero 94-gil (8 meters wide), a side street.
Following the approval of this district unit plan (draft), the project will proceed through additional permitting procedures, such as review by the architecture committee, with construction set to begin in the first half of next year and completion targeted for 2029.
Hot Picks Today
What Good Is Sheer Volume?... Even with 450 Trillion Won Poured In, Samsung and SK Hynix Remain Unmatched [Chip Talk]
- "They Keep Selling Off... Will I Lose Out Because of the SpaceX IPO?" [Weekend Money]
- Son Heungmin on Cass, Son Heungmin on Terra... The Secret Behind the 'World Cup Sponsor' Title [Matjalal X-File]
- "Why Did Anyone Eat This?" Once Shunned, Now Sold for 1 Billion Dollars [Delicious Stories]
- SK Shares Soar from 160,000 to 600,000 Won...What Will Happen to the Choi Taewon–Noh Soyoung Property Division?
A Seoul city official stated, "With the supply of prime-grade office facilities through this planning decision, new job creation is expected, and the commercial and cultural mixed-use spaces on the lower floors will become a key driver of new vitality in the Gangnam urban area."
© The Asia Business Daily(www.asiae.co.kr). All rights reserved.