Ansan Jugong 6-Danji Housing Reconstruction Maintenance Project Confirmed as Two-Way Contest... Daewoo Construction Also Participates in Construction Bidding

POSCO E&C Draws Attention with Minimum Contribution Solution View original image

As a result of the bidding for the construction contractor of the Ansan-si Danwon-gu Jugong 6 Complex Housing Reconstruction and Maintenance Project, two companies, POSCO E&C and Daewoo Engineering & Construction, participated.


POSCO E&C proposed the complex name “THE SHARP FirstONE.” It means the first, the only, and the one and only complex, with a plan to make it the best landmark as the first complex proposed under the THE SHARP brand in Ansan.


This project involves demolishing the Jugong 6 Complex apartments in Gojan-dong, Danwon-gu, Ansan-si, and transforming them into a complex with up to 36 floors, 9 buildings, and 1,017 households. POSCO E&C proposed to offer owners a premium of 720 million KRW per household by increasing sales revenue and reducing financial costs.


As a core strategy to increase sales revenue, they proposed a unique alternative design in collaboration with overseas design firms to emphasize differentiation. Based on POSCO E&C’s premium complex design expertise and technology, they plan to maximize product value through differentiation from surrounding complexes.


POSCO E&C designed the complex with a higher level than surrounding complexes to maximize openness and provide a private living experience by differentiating the complex.


Additionally, residents can enjoy special experiences through sky bridges and sky communities applied to this high-end complex, and the complex is designed with 100% cross ventilation and a south-facing orientation to enhance the quality of living spaces, the essence of residential life.



A POSCO E&C official stated, “Unlike the existing trust-type projects where the trust company is the main financier, we are responsible for procuring the necessary project funds and additional relocation costs to meet the wishes of owners who hope for a fast project. We also aim to reduce owners’ burdens to zero by offering 100% payment of move-in fees with no loans or interest incurred.”


This content was produced with the assistance of AI translation services.

© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.

Today’s Briefing