Line Construction Starts First Priority Subscription for 'Naepo New Town Easy The One Phase 3' on the 11th
[Asia Economy Reporter Tae-min Ryu] Line Construction announced on the 6th that applications for the first-priority subscription for 'Naepo New Town Easy The One Phase 3,' located in block RH4-1 of Naepo Innovation City, Chungcheongnam-do, will be accepted starting from the 11th.
Naepo New Town Easy The One Phase 3 consists of 15 buildings ranging from 2 basement floors to 26 above-ground floors, with a total of 954 households of exclusive areas 73㎡ and 84㎡. Together with the previously sold Phase 1 and Phase 2, a brand town of a total of 2,663 households will be formed.
The complex includes elementary, middle, and high schools such as Boseong Elementary School, Deoksan Middle and High School. It is also adjacent to a large Hanaro Mart, the planned Chungnam Sports Center, and the central commercial district. Nearby, there are Hongye Park and Mokri Stream Waterfront Park.
Naepo New Town Easy The One Phase 3 offers a household storage room in front of each unit. The 84㎡ units feature three-sided openings and a wide living room with a width of 6.1 meters. Various facilities such as a soundproof music lesson room and a gateball court are provided.
Naepo Innovation City, where the complex is located, was designated as Chungnam Innovation City in October 2020, and in June of this year, the West Sea Line-KTX (Gyeongbu High-Speed Railway) connection project was confirmed.
Hot Picks Today
You Can Receive Monthly Payments Like a Pension Without Selling Your Home... The Local Mutual Growth Housing Pension That Provides 1.69 Million Won Each Month
- "Unimaginable in Korea"...Koreans Surprised by Secondhand Smoke in Japan and China Restaurants
- Kim Jong Un Reportedly Mulling Additional Deployment of 50,000 North Korean Troops to Russia
- "Canceled After Five Days and Lost 770,000 Won"... Hit by Steep Fees After Pressing the Cancel Button
- "I Thought She Was an Ordinary SKT Employee... The Unexpected Identity of Nongshim's Third-Generation Bride"
Move-in is scheduled for March 2024. Special supply will be conducted from the 9th to the 10th of this month. The first-priority subscription will take place on the 11th, and the second priority on the 12th. The announcement of winners will be on the 19th. The official contract period is from the 30th to September 2nd.
© The Asia Business Daily. All rights reserved. Unauthorized AI training and use prohibited.